50 likes | 150 Views
DCS for ‘services’. costs. On behalf of Lennart Jird é n. Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc. Storage. WAN. LAN. Magnets. Rack control. Electricity. Safety: DSS. Safety: CSAM. Infrastructure. gas. cooling. LAN. Controller/. PLC. VME.
E N D
DCS for ‘services’ costs ALICE Technical Board On behalf of Lennart Jirdén
Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Storage WAN LAN Magnets Rack control Electricity Safety: DSS Safety: CSAM Infrastructure gas cooling LAN Controller/ PLC VME Field Bus Node Node Experimental equipment Central DCS 250K(racks, computers, network, cabling) Presented by Lennartin September TB Services Detectors Detailed costing per detector being prepared by Lennart.(for a next TB) Note: gas and cooling controls included in the overall costs of gas and cooling Total 1511K ALICE Technical Board
Cost of services (detail) Magnets Rack control Services Power distribution control 664 Safety: DSS 185 Safety: CSAM (LHC safety) Next slide 200 Safety: Sniffer 152 Sensors only; rest covered by LHC Area monitoring+smoke det. 70 Experimental Environment 50% by LHC 50% ALICE 200 20 Smoke detection covered by LHC; rest (20K) by TS/LEA 20 B-field, temperature, alignment etc. (only connection to DCS, not the sensors) Total 1511K ALICE Technical Board
Cost of services (detail)[Power distribution & racks] PC Rack control Services Power distribution control 185 LAN LAN 200 “PLC” PLC CANbus Smoke detection Rack Mon. “interlock” “Hazemeyer” S S S S S S S S T T T T T T T T Racks ALICE Technical Board
Overview ALICE Technical Board