1 / 20

CCSDS Engineering Steering Group: R eport to the CCSDS Management Council (CMC) and

CCSDS Engineering Steering Group: R eport to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010. SEA Updates. BSI, London, UK 03 November 2010. SYSTEMS ENGINEERING (SE) AREA. Peter Shames (AD) Takahiro Yamada (DAD).

shona
Download Presentation

CCSDS Engineering Steering Group: R eport to the CCSDS Management Council (CMC) and

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 SEA Updates BSI, London, UK 03 November 2010 Nov 2010

  2. SYSTEMS ENGINEERING (SE) AREA Peter Shames (AD) Takahiro Yamada (DAD) Nov 2010

  3. Systems Engineering Area Report • CURRENT GROUPS WITHIN THE AREA • Information Architecture WG (& ISA BoF, re-chartering) • Security WG • Delta-DOR WG • TimecodeWG (completed, Pink Sheets, ready for review) • Time Synchronization & Correlation BoF (charter produced) • Space Link Security BoF (joint w/ SLS, reported in SLS) • SANA Steering Group (WG completed, Yellow BookRIDs resolved) • SEA Responsibilities • Overall architecture for space mission communications, operations, and cross-support • Coordinate and collaborate with the other areas about architectural choices and options • Support the CESG in evaluating consistency of all area programs of work with the defined architecture • Create such working groups and BoFs as are required to progress the work of CCSDS Nov 2010

  4. SE Area ReportB. Meeting Demographics

  5. Systems Engineering Area Report • SUMMARY TECHNICAL STATUS • Information Architecture WG Goals: • Develop a high level Information Architecture Reference Model • Define Registry Reference model & associated registry information model (w/ IPR WG) • Re-charter IA WG to develop Information Services Architecture (ISA, SOA-like) reference model and services (draft charter Nov 2010) • Working Group Status: • IAWG developed top down registry reference model & prototypes, info model & services interfaces, IPR WG developed bottom up XML registry & prototypes to be coordinated in joint meetings, IPR not present for these working meetings • Extensive discussion on the Registry Reference Model Magenta Book, derived from ebXML (White) and Information Services Architecture recommended practice (White); expect Registry Reference Model Red Book for review Dec 2010 • Presentations were given in the SM&C WG and RASIG meetings. Agree to do joint prototyping of SM&C Directory Service using ISA Registry framework. • Revised charter for Information Services Architecture WG has been drafted • Working Group Summary Situation: Nov 2010

  6. Systems Engineering Area Report • Security WG Goals: • Develop security overview & threat assessment, and security architecture, framework and related standards • Current focus (security architecture, algorithms, key management, mission planners, glossary) • Working Group Status: • Progress • Algorithm document (BB draft Red-1) updated, to be completed in Winter 2010. Planning for implementation & testing, Yellow Book. • Security Architecture sent to AD, to be sent to CESG this Fall. • Mission Planners Guide to be sent to Tech Editor this Fall. • Key Management Green Book completed, to be sent to Tech Editor. KM Blue Book (White) for symmetric KM making good progress, discussed with SM&C. • Security Glossary, need to substitute ISO definitions where available, to be complete by Winter 2010 • Network layer security – IPSec with Encapsulating Security Payload (ESP), only relevant in near Earth (out to Lunar) operations domain. • Good joint progress on Space Link Layer Security WG, reported in SLS • Working Group Summary Situation: Nov 2010

  7. Systems Engineering Area Report • Delta-DOR WG • Goals: • Develop detailed requirements for delta differential one-way ranging (Delta-DOR) service • Coordinate work in other WGs (SLS/Ranging, CSS/CSTS, MOIMS/Nav, CSS/SM) • Develop integrated vision of service and interoperability points • Working Group Status: • Magenta Book: second Agency review completed, 30 RIDs resolved, sent MB to AD for publication in Fall 2010. • Delta-DOR Raw Data Exchange Format (DRDEF) Blue Book draft (Red-1): AD issues were resolved. Book to be submitted for CESG Review by Nov 2010, complete agency review of Red-1 by Feb 2011. • Schedule for the Green Book has been pushed to Spring 2011 • Good progress on early & near term 3 agency interoperability validation, all three agencies committed to doing interoperability testing, YB test report being planned • WG reports that not having NASA rep for face to face meetings hampered progress (budget issues) • Working Group Summary Situation: Nov 2010

  8. Systems Engineering Area Report • Timecode WG Goals: • Update timecode formats • Explore need for time and synchronization standards • Working Group Status: • No meeting in London • Revised Pink Sheets for Time Code reviewed & RIDs resolved • WG ready to disband once Pink Sheets are published • WG has done validation prototyping, has completed tests and finalized interoperability report, submitted to Secretariat for agency review • Working Group Summary Situation: Nov 2010

  9. Systems Engineering Area Report • Time Correlation & Synchronization BoF Goals: • Develop outline for White Paper and requirements for time correlation and synchronization standards • Develop WG charter • BoF Status: • BOF met on Wednesday afternoon with limited attendance (Greenberg (JPL), Pitts (MSFC), Sank (GSFC), Enrich (ESA), Gracher (FSA)) . • Discussed requirements, priorities, and agency interests • ESA’smain objective is a Magenta Book identifying best practices for time correlation with current standards • NASA is interested in advocating methods to achieve much more accurate time correlations for space missions. • NASA has a long term goal of establishing a standard for synchronization of the clocks on vehicles within a remote operational network. • Agree to start with the Time Correlation Magenta Book and to advocate for higher accuracy time stamp with other groups, then assess requirements for time correlation and synchronization • Draft charter has been sent to AD to be forwarded to CESG Nov 2010

  10. Systems Engineering Area Report • SANA Operations Goals: • Operate the Space Assigned Numbers Authority (SANA) • Operations Status: • SANA operator in place, met this week with several WGs, created web site including a set of candidate registries based on existing CCSDS documents • Draft Yellow Book procedure CCSDS 313.0-Y-0.1 sent for final CESG review • Requests new “SANA Considerations” section and WG interaction on registry items • Draft “candidate registries” need to reviewed by WGs, simple procedure developed for handling “grandfathered” registries already documented • Met with SIS-AMS,DTN, SLS-SLP, SEA-SEC, MOIMS SM&C & Nav, CSS-CSTS • SANA Steering Group met • CESG Chair, SEA AD, SANA WG rep • Need to identify at least two other members to ensure stakeholder & agency balance • Need to develop policy for CCSDS OID registry management • Operations - Summary Situation: Nov 2010

  11. SANA Web Sitehttp://www.sanaregistry.org Nov 2010

  12. Joint IA/IPR Meeting No meeting held, MOIMS IPR not present for meetings Propose combining all interested participants into new ISA WG that is being chartered, MOIMS AD has stated no objection Joint SM&C / IA Meeting Present the space Information Services Architecture (ISA) reference model, the registry service architecture and its relationship to the rest of the CCSDS services Discussed the relationship between the SM&C “directory service” and the ISA framework Agreed to coordinate with SM&C To demonstrate implementation of the SM&C Directory service using the ISA Registry reference model and prototype implementation To evaluate the SM&C MAL as a possible messaging layer for ISA, along with HTTP Sec WG / SDLS Meeting Joint meeting was productive and work is largely on track Have identified no “show-stopper” from security point of view with how and where the security block is to be inserted in the space link frames Details reported by SDLS WG chair in SLS report Will require resources for interoperability testing … • Systems Engineering Area Report D. Cross Area Meetings Nov 2010

  13. Systems Engineering Area Report D. Cross Area Meetings, contd • SEA / CSS Reference Architecture SIG • Relationship between CCSDS Reference Architecture and RASDS and ISA seems to now be quite well understood and agreed • There is agreement on a reference architecture framework consisting of the RASDS Viewpoints (Enterprise, Functional, Connectivity, Communications, Information), with an added Service Viewpoint ala the Cross Support Services Architecture (also used in IOAG SISG efforts) and some expansion of the Information Viewpoint ala the RASIM • Growing recognition that there is a need for the sort of UML or SysML architecture modelling framework that was halted in the earlier RASDS work • SEA recommends adopting a streamlined approach that focuses immediately on two items: • Revisit the RASDS and quickly develop the conceptual framework for modeling the Service Viewpoint and the extended Information Viewpoint • Work with the ESA modeling team to refine the set of viewpoint specifications that they apply to the ExoMars modeling effort, which is intended to verify the framework and provide useful models of ExoMars Nov 2010

  14. Systems Engineering Area Report E. SUMMARY: MAJOR ACCOMPLISHMENTS AND CONCERNS IN LAST REPORTING PERIOD, contd • Time Code WG • Time Code Pink Sheets sent to Secretariat • Time Code Test Report Yellow Book done (Aug 2010) • Time Correlation & SynchronizationBoF • TimeCorrelation & Sync White Paper in discussion • Time Correlation & SyncWG Charter agreed (to CESG Nov 2010) • SANA Operations • SANA Policy & Procedures Yellow Book CMC review (Nov 2010) • SANA Web Site Operational Candidate registries for review • CCSDS Glossary Draft version Dec 2010 Nov 2010

  15. Systems Engineering Area Report E. SUMMARY: MAJOR ACCOMPLISHMENTS AND CONCERNS IN LAST REPORTING PERIOD • IA WG (ISA BoF) • RASIM Reference Model Green Book being updated for SOA • Registry Reference Model Magenta Book drafted (expect Red-1 Dec 2010) • Information Services Architecture Concept Paper updated (WP Jan 2011) • ISA WG Charter Draft prepared (to CESG Nov 2010) • Sec WG • Security Algorithms Integrated Blue Book drafted (Red-1 Winter 2010) • Key Management Green Book to CESG (Nov 2010) • Symmetric Key Management Blue Book being drafted (WB Winter 2010) • Mission Planners Security Guide Green Book final to editor (Nov 2010) • Network Layer Security Green Book in planning (WB Fall 2010) • Security Glossary Expect to put in SANA (Winter 2010) • Delta DOR WG • D-DOR Reference Model Magenta BookRIDs processed (Blue Winter 2010) • D-DOR Data Exchange Blue Book to Agency review (Red-1 Nov 2010) • D-DOR Overview Green Book draft begun (GB Apr 2011) Nov 2010

  16. Systems Engineering Area Report Forthcoming Resolutions from SEA: • Submit Time Correlation and Synchronization WG charter for approval (Nov) • Submit Information Service Architecture (IA WG re-chartering) for approval (Dec) • Forward D-DOR Magenta Book for final approval for publication (Nov) • Forward D-DOR Raw Data Exchange Blue Book for Red-1 review (Dec) • Forward Security Reference Architecture Magenta Book for Red-1 review (Nov) • Forward Security Key Management Green Book for final approval for publication (Nov) • Forward Mission Planners Security Guide Green Book for final approval for publication (Nov) • Request Secretariat to insert SANA Registry web site in the CCSDS web site as the main registrar Nov 2010

  17. CCSDS Procedures update Out for final CMC review, needs badly to be published SANA Considerations The SANA YB requests that the CCSDS Procedures & Publications manuals be updated to reference a mandatory “SANA Considerations” section, to be discussed SANA asks that the CMC appoint at least two other members to the SANA Steering Group to ensure stakeholder & agency balance SANA Operator has created candidate registries, including a CCSDS Glossary, need to have these reviewed by Areas & WGs and approved for release (or not) All new WG projects should analyze SANA issues as part of their process, and ensure that they address them, potentially with support of the SANA operator SEA IA and MOIMS IPR WGs Working groups have been operating increasingly well as a joint effort for a few years now SEA AD recommends that these two groups be re-organized into one, with a new charter that is focused on the Information Services Architecture and also incorporates the present registry-repository and information modeling and architecture tasks A new ISA WG charter has been drafted and is being finalized Words of appreciation The SEA wishes to thank the workshop organizers for doing an excellent job of arranging the facility, and managing meetings rooms • SYSTEMS ENGINEERING AREA: • ITEMS TO BE BROUGHT TO CMC ATTENTION Nov 2010

  18. Nov 2010

  19. Quoted from Procedures Manual, A02.1-Y-2.1a • 1.4.2 b) Consensus. • The entire CCSDS technical organization is run by a process of consensus, and it is the CESG that decides if the standardization process has come up with a result that reflects a real consensus. • Consensus does not necessarily mean that unanimous agreement has been reached, but that the result incorporates the best set of compromises that all parties can agree to. • 1.4.3 CESG Responsibilities • h) reviewing requests from ADs to advance specifications in their Areas along the various document tracks, and making consensus recommendations to the CMC when it feels that documents and related materials are ready for publication as CCSDS products, in their various interim and final stages of maturity; Nov 2010

  20. SEA CCSDS Procedures Pending Secretariat finalization Security WG Security Architecture (MB) RB, being edited for agency review Encryption & Authentication (BB) Combined into “folio” Algorithm RB, final edits Mission planner (GB) WB, 3rd draft Key Management (GB, MB) GB, draft to editor after meeting, MB discussions Standard security section Mandatory Information Architecture WG RASIM, including Use Cases & patterns (MB) GB needs updates for ISA IA / IPR Registries (BB) Being prepared for RB review; NASA implementation underway SOA & Web Services Ref Arch (MB) IA shifting to Information Services Architecture focus Delta-DOR WG Overview document (GB) WB Draft distributed to the WG Standard practice (MB) RB had 2nd Agency review, RIDs to be processed Data Exchange standard (BB) RB draft to editor Fall 2010 (after Fall Meeting) Time Code WG Time Code Standard (BB) Finish interoperability test report then agency review Time Correlation and Synchronization BoF Draft charter Update draft charter, gather requirements and initiate white paper SANA WG Work completed SANA YB in CESG review SEA Meeting Objectives Updated: Shames Nov 2010

More Related