Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer Board of Directors: James Fritz, President Michael Di Giorgio, President Pro Tem Arthur Knutson William Long George Quesada. Project Goals. Energy Efficient Design Low Cost State Loan
E N D
Novato Sanitary District Wastewater Facilities UpgradePresenter: Beverly James, Manager-EngineerBoard of Directors:James Fritz, PresidentMichael Di Giorgio, President Pro TemArthur KnutsonWilliam LongGeorge Quesada
Project Goals Energy Efficient Design Low Cost State Loan Low-Impact Construction • Replace aging, failure-prone, unsafe facilities • Provide full secondary treatment to all flows – NO BLENDING • Meet regulatory requirements • Reduce carbon footprint • Cost-effective
After almost 60 years of Service Novato Sanitary District breaks ground for a new plantSeptember 2006
Novato Sanitary District Energy Efficient Design Low Cost State Loan Low-Impact Construction • Serves about 60,000 residents. • 200 miles of sewers, 40 pump stations • Two wastewater treatment plants, • 0.5 mgd tertiary recycled water treatment plant • 820 acres of ponds and irrigated pasture.
Novato Sanitary District Service Area Ignacio Tributary Area Novato Tributary Area
Project Overview • New transfer pump station and equalization basins replace Ignacio Treatment Plant • Pipeline from Ignacio Pump Station to Novato Plant • New Activated Sludge Plant at the Novato Plant site Average Dry Weather Flow 7 mgd Average Wet Weather Flow 10.3 mgd Peak 3-hour Flow 52 mgd
Treatment Process Schematic Gravity Bypass Septage Headworks Primary Clarifier ActivatedSludge Secondary Clarifier UV Effluent Influent Thickening Digestion Disposal
Construction designed for minimum impact • Most construction takes place on existing treatment plant sites • Horizontal drilling through environmentally sensitive areas • Pipeline route selected to minimize traffic disruption • Archaelogical and biological monitors onsite during work in sensitive locations
Project Financing • State Revolving Fund Loan $81,329,083 • Revolving Line of Credit $30,000,000(5 year Bridge loan at 4.34%) • Certificates of Participation $16,000,000or Revenue Bonds • PG&E Savings by Design $80,000Grant
Greenhouse Gas Emissions • Evaluated the greenhouse gas footprint of current treatment facilities and each alternative • Selected the process with the lowest greenhouse gas footprint (0.0066 lbs CO2 equivalent/year/mgd capacity) • New facility represents a 13% reduction in greenhouse gas footprint over existing facility. • Evaluated individual equipment based on energy use.
Ignacio Equalization Basin Project Overview Approach Energy Efficient Design Energy Production Summary
Project Team • Project Manager: Sandeep Karkal, NSD • Planning and Design: RMC Water • Environmental: ESA • Value Engineering: HDR & Covello • Constructability Review: HDR & Covello • Construction Management: HDR & Covello • Contractors:Pre-loading: Ghilotti Brother’s ConstructionIgnacio Pump Station: Maggiora & GhillottiIgnacio Pipeline: Ghilotti ConstructionNovato Treatment Plant: Monterey Mechanical
Thank YouQuestions? Contact Information: Novato Sanitary District500 Davidson Street (415)892-1694 www.novatosan.com Beverly James: bevj@novatosan.com