Principalirealizzazioni di edilizacivile al CERN neiprossimi 5 annieContrattinelsettoredell'ingegneriacivile, impiantiterziari e processiindustriali al CERN Dr. Ing. Luigi Scibile Head of the Site Engineering Group Site Management and Buildings Department CERN 6-7 June 2019 07.06.2018, L. Scibile, EDMS: 2161487
Existing CERN Infrastructureandbrief history 07.06.2018, L. Scibile, EDMS: 2161487
SITE CONSTRUCTION DEVELOPMENT MEYRIN 1950-60 1960-75 1975-85 1985-2010 PREVESSIN 1970-80 1980-2010 Constructed in the period Constructed in previous periods 07.06.2018, L. Scibile, EDMS: 2161487
CERN Area Prévessin (FR) Campus Meyrin (CH) Campus (it extensds in French LHC Border Geneva Airport 07.06.2018, L. Scibile, EDMS: 2161487
Meyrin Site 07.06.2018, L. Scibile, EDMS: 2161487
Current underground infrastructure • Tunnels: • 27 km long • 100 m approx. below grade • ̴60km total length of tunnels 07.06.2018, L. Scibile, EDMS: 2161487
CERN today - key figures • Two main sites : • Meyrin (CH-FR) : 80 hect. • Prévessin (FR) : 83 hect • 15 satellite sites • Number of buildings : ̴ 674 • 10m2 up to 20.000m2 , 425,000 m2 of surface • 60% of the buildings are 30+ years old • Tunnel lengths : > 70 km • Caverns: > 80 • 30 km of roads • 1000 km of technical galleries/trenches • Total CERN fenced territory : 208 hect. • Total CERN unfenced territory : 418 hect • fenced territory - CH: 51 hect. • unfenced territory - CH : 59 hect. • fenced territory - F : 157 hect. • unfenced territory - F: 359 hect. • 495 hostel rooms • ̴ 2667 Staff • ̴ 2094 Fellows, trainees and Paid Assoc. • ̴ 12569 Users • ̴ 5000 Contractor employees • ̴ 135000 visitors/y • ---------------------------------------------- • On average ~ 9’500 people every day at CERN 07.06.2018, L. Scibile, EDMS: 2161487
Site Engineering Group 07.06.2018, L. Scibile, EDMS: 2161487 • The Site Engineering Group is responsible for : • Design of all new buildings & civil engineering structures on CERN Site. Feasibility studies more often done in-house with outsourced consultancy services for more detailed design. • Project Management for execution (with Consultants for larger projects) • Maintenance of all buildings and underground structures • Renovation Works • HVAC & Electrical works and maintenance for ‘tertiary’ buildings • Patrimony data management • Group consists of : • 25 engineers/architects • 10 draughtsman/designers • 25 technicians • Annual Budget approximately • 50 -> 100 MCHF for Projects & Operation / Renovation Works
Some examples of different types of projects 07.06.2018, L. Scibile, EDMS: 2161487
HL-LHC Project Underground structures at Point 1 07.06.2018, L. Scibile, EDMS: 2161487
HL-LHC project – Point 1 07.06.2018, L. Scibile, EDMS: 2161487
New building 947 Prevessin Site development 10.000 m2 flexible storage 07.06.2018, L. Scibile, EDMS: 2161487
Building 774 Major Objectives 2012 Tertiary Building : officies and labs Surface gross area : 3950 m2 Delivered : february 2015 07.06.2018, L. Scibile, EDMS: 2161487
MEDICIS works • Addition of experimental area • Special shielding • Cross-border difficulties Magnetite ore Magnetite concrete high density 3.9 kg/dm3 (normal concrete 2.2 kg/dm3) Preparation 07.06.2018, L. Scibile, EDMS: 2161487
B157 – East Hall renovation • Scope: Asbestos removal and shellrenovation 07.06.2018, L. Scibile, EDMS: 2161487
Renovation works : Offices 07.06.2018, L. Scibile, EDMS: 2161487
Renovation works : Hotels 07.06.2018, L. Scibile, EDMS: 2161487
HVAC B771-Polymer lab 17000 m3/h For hall 5 ovens 7 fume cupboards (4 Atex) 6 Chemical cupboards 2 Polymerpowderextractors Vacuum pumps extraction Hvac of the labs Solar hot domestic water 07.06.2018, L. Scibile, EDMS: 2161487
Electrical boards renovation Before After 07.06.2018, L. Scibile, EDMS: 2161487
Future projects (5y) 07.06.2018, L. Scibile, EDMS: 2161487
Science Gateway • Architect: Renzo Piano • Estimated cost: 79 MCHF • Facility for scientific education and outreach • Footprint of 7’000 square metres • Call for tenders construction Q3-2020 More info: https://home.cern/news/press-release/knowledge-sharing/cern-unveils-its-science-gateway-project 07.06.2018, L. Scibile, EDMS: 2161487
B777 program • Architect: TbD • Estimated cost: 35-45 MCHF • Office building, restaurant & kindergarten • Footprint of 10’000 square metres • Call for tenders Design Q1-2020, Construction Q1-2021 Image: Scaravaggi architects Image: AGA architects Image: AGA architects 07.06.2018, L. Scibile, EDMS: 2161487
Additional future buildings (5y) (see following slides) • B179: • 170 m2 industrial building for MTE Kickers • Call for tenders Construction Q3-2019 • B937: • 1’200 m2 Office building • Call for tenders Design & Construction Q4-2019 • B38 renovation: • 3000 m2 hotel renovation • Call for tenders works Q4-2019 • Bxxx: • 2 x 1500 m2 industrial building for experiments • Call for tenders Construction Q3-2020 • Bxxx : • 225 m2 industrial building for MTE Kickers • Call for tenders Construction Q1-2021 • Bxxx: • ~ 5 x 500 m2 following typical CERN growth. 07.06.2018, L. Scibile, EDMS: 2161487
Consolidation programme • Consolidation campaign: • Toilet block • Roof, Façade and Windows • HVAC, Sanitary and Electrical systems • Natural Smoke extraction • Road and Sewage • Lift • Consolidation projects: • Full building renovations ~ 1 x year from 2022 • Large roofs/façade ~ 1 x year • Large technical installations ~ 1 x year • Overall budget ~13-14 MCHF/year Frame contracts (see following slides) Single contracts (see following slides) 07.06.2018, L. Scibile, EDMS: 2161487
Works and Maintenance Services • Architectural & Engineering support services • Topography and Patrimony services • Building and civil engineering services • Road and sewage services • Barrack and temporary buildings services • Green spaces services • HVAC and Sanitary installations services • Electrical installations services • Overall budget ~10-15 MCHF/year Mainly Frame contracts + Single contracts (see following slides) 07.06.2018, L. Scibile, EDMS: 2161487
Opportunities at CERN TLEP 07.06.2018, L. Scibile, EDMS: 2161487 For Engineering firms & Contractors Call for tender for Frame Contracts Call for tender for specific Projects/single contracts.
5Y Future and ongoing “Call for Tender” • New buildings • ~2 Contracts 35’000kCHF ÷ 60’000kCHF • ~5 Contracts 2’000kCHF ÷ 7’500kCHF • Implementation of the Consolidation program and large works: • ~ 2 contracts 3’500 KCHF to 10’000 KCHF • ~ 10 contracts 750 KCHF to 2’500 KCHF • ~ 25 contracts 200 KCHF to 750 KCHF • Frame contracts for works & maintenance: • ~10 contracts 500 KCHF/y to 8’000 KCHF/y 07.06.2018, L. Scibile, EDMS: 2161487
Links • Doing business with CERN official page:http://procurement.web.cern.ch/en/doing-business-with-cern • Forthcoming market surveys and calls for tenders: https://found.cern.ch/java-ext/found/CFTSearch.do Example Cost range A <750k, 750k<B<5M, 5M<C<10M, D>10M Reference/department 07.06.2018, L. Scibile, EDMS: 2161487
Conclusions • Opportunities for medium and large companies • Different specialties (underground and buildings) • Special attention to be paid to: • The location and local rules (CH/F) • The local prices (materials, wastes, workforce, etc.) • CERN framework (Radiation, Worksites, Safety rules, etc.) 07.06.2018, L. Scibile, EDMS: 2161487
Thank You for your attention 07.06.2018, L. Scibile, EDMS: 2161487