An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. California Transmission Planning Group Collaborative approach to State-wide Transmission Planning

  2. State energy and environmental policy goals drive transmission need • Significant enhancements to transmission licensing and cost recovery processes necessary to achieve 33% and 20% Renewable Portfolio Standard (RPS) • Need and timing for additional transmission under a 33% goal is greater, but still need significant transmission investment to meet 20% • Need to be proactive concerning grid impact of renewable generation

  3. CTPG formed to address transmission needs across the entire State • Formation resulted from ongoing discussions facilitated by FERC • Collaboration of transmission operators and transmission owners with obligation to serve consistent with FERC Order 890 • Develop annual California transmission plan to address broad needs of transmission for California • Identify opportunities for joint transmission development projects • Not a development group and does not perform detailed siting or routing

  4. Coordination with RETI and other stakeholder groups essential • Stakeholders provide input to study plan to shape transmission expectations and drive planning studies • Stakeholder meetings with RETI and public groups • Comment periods provided for draft study plan and results