TS-CSE

TS-CSE. TCR and CCC. Outline TCR and TS-CSE-CO mandate Applications Console layout Hardware and Operating System Strategy Conclusion. TCR and TS-CSE-CO mandate. TCR The TCR monitors and operates 24 hours a day, 365 days a year the entire technical infrastructure of CERN comprising :

Download Presentation

TS-CSE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TS-CSE TCR and CCC Outline • TCR and TS-CSE-CO mandate • Applications • Console layout • Hardware and Operating System • Strategy • Conclusion Uwe Epting - TS/CSE-CO

  2. TCR and TS-CSE-CO mandate • TCR • The TCR monitors and operates 24 hours a day, 365 days a year the entire technical infrastructure of CERN comprising : • the electrical distribution network and energy consumption management • heating, cooling, ventilation and air conditioning equipment • safety installations, high vacuum and cryogenic systems • any other infrastructure equipment • TS-CSE-CO • The TS-CSE-COntrol systems section is responsible for the development and maintenance of the control systems and the computing environment for the Technical Control Room (TCR) … Uwe Epting - TS/CSE-CO

  3. TCR Applications W2K Linux IT AB TS Ext. Application Yacoma CAS / LASER UMMI / Jviews (for TIM) Hummingbird Exceed 8.0 (IT) Internet browser: IE 6 (IT standard) CERN phone book (IT) Windows Netmeeting (remote maintenance) PuTTY + VNC Wizcon and Wizweb (TS/CV applications) MP5 (maintenance DB - DataStream) PVSS (for GTPM and Vacuum) Spectrum (JRE 1.4.2) JavaGUILS Geoconcept 5.0 (SIG cartography) Aesys (for CERN entry panels) LabView (for SPS ventilation) Pcvue (CSAM and Access Control) Outlook XP (for TCR and personal e-mail) 18/5 9/6 9 4 6 6 Total Windows only Windows or Linux Linux possible Service and Maintenance Uwe Epting - TS/CSE-CO

  4. TCR Layout (today) CSAM Consoles TCR pc (admin.) Oper. pc TCR Operational Consoles Oper. pc Uwe Epting - TS/CSE-CO

  5. TCR Hardware and OS (today) • Hardware • 7 PC running Windows (PIV-2,8GHz) • 3 pc with 1 screen • 3 pc with 2 shared screens • 1 pc with 3 shared screens • 1 Unix Console • Connected to the Technical Network (172.18) and surveilled by Spectrum • 13 CRT 21” screens, 2 19” LCD screens (CSAM), 2 CRT 19” for operator personal use • 9 wired keyboard and mice, 1 wireless keyboard and mouse • Constraints • 1 PC = 1 CAS application • PVSS zooming and overview capability • Number of keyboards and mice • 2 layers desk, not very ergonomic • Administration • Windows updates • Windows GPO applied on operational consoles • 1 operational account: tcroper • Applications startup only allowed from Yacoma Uwe Epting - TS/CSE-CO

  6. Current Strategy • Integration of industrial systems • Equipment groups provide TCR views based on their tools • Development in equipment groups when possible • Additional TIM views where necessary • Use of common HCI conventions • Operation and Maintenance • Use of standard components (PCs) • Use of IT support when possible • Experience with Windows consoles: • Easy administration (1.5 persons on part time) • No downtime since two years • Cheap maintenance Uwe Epting - TS/CSE-CO

  7. Conclusion • Choice of Windows as operating system was taken based on PCR choice some years ago • Strategy for integration of LHC infrastructure monitoring is based on Windows and available standard industrial components and contracts with industry • TCR system requirements do not change for CCC • Maintenance and repair quite easy • No manpower, no budget and no time planned for changes • Feasability for migration to LINUX not yet studied Uwe Epting - TS/CSE-CO

  8. Questions ? Uwe Epting - TS/CSE-CO