1 / 7

SANITARY SEWER REPLACEMENT AT N. ALFRED STREET PROJECT

Join us for a public information meeting on July 12, 2018, to learn about the Sanitary Sewer Replacement project. The objective is to replace the existing sewer infrastructure and reconnect laterals to the upgraded system. Construction will take place from summer 2018 to fall 2018, with phased lane and sidewalk closures during work hours.

silvam
Download Presentation

SANITARY SEWER REPLACEMENT AT N. ALFRED STREET PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SANITARY SEWER REPLACEMENT AT N. ALFRED STREET PROJECT Public Information Meeting July 12, 2018 David Le, P.E. Civil Engineer III/DPI

  2. Project Location • North of the Cameron St & N Alfred St Intersection

  3. Project Objective • Replacing existing sanitary sewer infrastructure • Reconnect laterals to upgraded sanitary sewer

  4. Project Design

  5. Schedule Construction (Summer 2018 - Fall 2018)

  6. Traffic Impact • Phased lane and sidewalk closures during work hours.

  7. Thank You David Le, P.E. Civil Engineer III/DPI David.Le@alexandriava.gov 703-746-4058 Department of Project Implementation Active Construction Website https://www.alexandriava.gov/dpi/info/default.aspx?id=85740