The Alachua County Mobility Plan:

The Alachua County Mobility Plan:. 2010 Bicycle and Pedestrian Work Program Update. Bike / Ped Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects

silver
Download Presentation

The Alachua County Mobility Plan:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Alachua County Mobility Plan: 2010 Bicycle and Pedestrian Work Program Update

  2. Bike / Ped Work Program Update • Several top projects from 2008 Work Program have been completed. • Design is ongoing on other top projects • Funding for portion of Archer Braid Trail procured through FDOT for construction in 2012-2013 • 10% of the 5 cent local option gas tax funds approximately $200,000 – $250,000 per year dedicated for construction of bicycle and pedestrian projects

  3. Bike / Ped Work Program Update • Commission requested staff to review priority project list following recent community meetings. • Staff reviewed specific projects requested by the Commission and have produced a recommendation on project priorities.

  4. Specific projects requested for review • Move restriping of SE 15th Street towards top of priority list. • Consider reconstruction and widening to 8’ the existing sidewalk on the east side of SE 15th rather than construct new 8’ facility on the west side. • Move neighborhood connector at SW 1st Place towards the top of the priority list. • Consider construction of 8’ facility on the north side of SW 24th Ave between Tower Road and I-75 rather than complete the existing sidewalk on the south side over I-75.

  5. SE 15th Street Corridor

  6. SW 1st Place at SW 77th Terrace

  7. SW 20th/24th Ave Corridor

  8. STAFF RECOMMENDATION • Project Priority Ranking: • SW 8th Ave Multiuse Trail • NW 98th Street Sidewalk • SE 15th Street Restriping • SW 1st Place Connector • SE 15th Street Multiuse Path • SW 20th/24th Sidewalk Extension on south side and feasibility study of multiuse facility on north side

  9. STAFF RECOMMENDATION • Approve 2010 Bicycle/Pedestrian Work Program Priority List