Economic and Reliability Optimization for Central Energy Facilities. F i n a n c i a l C o n s u l t i n g S e r v i c e s. James T. Drews, Presenter POWER-GEN International Orlando, Florida November 30, 2004. Two Case Studies. Large university:
E N D
Economic and Reliability Optimization for Central Energy Facilities F i n a n c i a l C o n s u l t i n g S e r v i c e s James T. Drews, Presenter POWER-GEN International Orlando, Florida November 30, 2004
Two Case Studies • Large university: Optimized existing resource utilization • Metropolitan newspaper: Self generation upgrade evaluation
Large University • Two campus electrical load • 2 gas turbine cogeneration units (13.6 MW) • 2 power purchase agreements (46 MW) • Campus-wide heating requirement • 5 boilers (225 kpph) & 2 HRSGs (48 kpph) • Campus-wide chilled water system • 15 electric chillers (23,500 tons)
Operating Scenarios Instantaneous Operating Conditions
Lessons Learned • Distinct resource utilization option results in lowest energy cost • Effective modeling will determine lowest energy cost options • Management utilization of resource tool will minimize energy costs
Metropolitan Newspaper • Approximate 4 MW peak load • Installed 3 MW gas turbine • Heat recovery steam generator (17 kpph) • 3 chillers: electric & absorption
Supply Options Results • Existing installation most cost effective • Larger units inefficient given load profile • Payback 11+ years on other viable options • Potential improvements • Peak load reduction • Third-party fuel supply • Client avoided an undesirable investment
The Bottom Line • Hourly load profiling is critical • Integrated annual hourly energy supply/use model must be tailored for client specifics • Capital investment/supply contracting options require detailed load analysis • Management & accountability is critical