1 / 5

MVD configurations in runs 4,5

MVD configurations in runs 4,5. Analysis meeting 1 Feb 2006 Hubert van Hecke. Run 4. For run 4, only the MVD endcaps were installed. The enclosure was rebuilt to present the minimal mass to the Central Arm spectrometers. The MVD endcaps were successfully operated for the run 4 AuAu run.

sitara
Download Presentation

MVD configurations in runs 4,5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MVD configurationsin runs 4,5 Analysis meeting 1 Feb 2006 Hubert van Hecke

  2. Run 4 For run 4, only the MVD endcaps were installed. The enclosure was rebuilt to present the minimal mass to the Central Arm spectrometers. The MVD endcaps were successfully operated for the run 4 AuAu run.

  3. details Cold air duct mylar, black tape Enclosure 6 mm rohacell 60.7 cm clear space Structural member 0.5 mm Al tube

  4. Run 5 Multi-event buffering meant modifying the FEE FPGA code. Tested with pulsers in the fall 04, but code failed under real trigger conditions - no data written during CuCu run. MVD cannot operate with pp - multiplicity too low. MVD was removed after run 5

  5. MVD in Pisa Full MVD configuration: Run 4, 5 configuration, In phnx.par, set N_CAGES=0

More Related