An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 • Reetika Rastogi - Project Manager, Life Cycle Planner • Tushar Saxena - Operational Concept Engineer, Requirements Engineer • Cristina Cano - Prototyper, Feasibility Analyst • Rohit Mani - Requirements Engineer, Life Cycle Planner • Sanjay Kutty - Feasibility Analyst, Software Architect • Shruti Sannabhadti - Software Architect, Prototyper

  2. Operational Concept Overview Tushar Saxena 1

  3. Anthropological case study tool cataloging an ax-fight incident of the Yanomamö tribe Enables users to watch the incident video while reading various incident related texts Users can also look at pictures of tribe members, genealogical information, and other graphs and charts Old system (on CD-ROM) only worked on classic Mac machines New system is implemented on a DVD and browser-dependent Operational Concept Overview 2

  4. Play Time Based Media (TBM) Link genealogies to TBM Link statistics to TBM Link stills to TBM Link text to TBM Provide written text for reading Increased availability and wider outreach of course material Better learning environment for students Facilitates deeper learning and information access about the culture Increased academic prestige Organizational Goals Win Conditions 3

  5. Demo of Initial Operational Capability (Product status demonstration) -- Cristina Support Plan -- Rohit Test Cases, Procedure and Results -- Rohit Quality Focal Point -- Reetika Summary of Transition Plan -- Sanjay & Shruti TRR Outline 4

  6. Full operation of the capabilities provided to the client Provide the system on a DVD System functionality replicates the original system Testing on different browsers on our local machines Transition Objective 5

  7. Testing along with client to ensure operational satisfaction Creating test data to ensure that the functionalities are working as expected Test the system at the client’s site Ensuring ease of use for the client as it is a new system Transition Objective 6

  8. Development of the system Testing the system Look and feel Functionality Different machines and browsers Transition Strategy 7

  9. Provide training to the client using the training document Create user manual Obtain feedback Transition Strategy 8

  10. Demo of Initial Operational Capability Cristina Cano 9

  11. Support Plan Rohit Mani 10

  12. Support Plan • The system has been tested by implementation team and is ready for use • Remaining bugs and further feature development will be handled by the client • The development team will not be making any additional changes to the system 11

  13. Test Cases, Procedures, and Results Rohit Mani 12

  14. Testing • Testing by implementation team • Testing by the client • Final testing will be done at the client site and the implementation team will be present to document any known issues and bugs 13

  15. Test Cases • TC-01-01: Media Playback • TC-01-02: Video Skipping • TC-01-03: Fullscreen video • TC-02-01: Text Linking • TC-02-02: Genealogies • TC-02-03: Stills • TC-02-04: Maps • TC-02-05: Rolling Text 14

  16. Test Procedures • An acceptance test script is used to guide the testers as they interact with the system • All the test cases in the test plan will be covered by this script • Any bugs encountered will be documented 15

  17. Test Results Test #1 - 11/18/2013 Rolling Text not implemented - Bug #834 Test #2 - 12/02/2013 All capabilities implemented Test #3 - 12/05/2013 Final Training and Testing 16

  18. Quality Focal Point Reetika Rastogi 17

  19. 18

  20. 19

  21. 20

  22. Technical Debt • Not choosing to auto-detect faces • Text hard-coded into the HTML file -- working on resolving now 21

  23. Traceability Matrix 22

  24. Transition Plan Sanjay Kutty & Shruti Sannabhadti 23

  25. Hardware preparations • Any operating system • Ex: Windows, Mac, Linux • The computer should also have an operational DVD drive • No extra hardware 24

  26. Software Preparations • Modern web browser is required • IE 11+, Mozilla Firefox 9+, Google Chrome and Safari 10+ • The browser should be HTML5 compliant 25

  27. Site and Staff Plan • No specific site preparation is required • A desktop or laptop with the mentioned requirements • No staff required 26

  28. Training 27

  29. Stakeholder Roles & Responsibilities 28

  30. Milestone Plan 29

  31. Required Resources • The entire implementation team, has to be present during client training, testing and final delivery of the project • Basic hardware and software requirements as enumerated earlier • No additional staff or personnel required for installation or maintenance 30

  32. Software Product Elements • All the libraries, images and other necessary files required for the working of the Yanomamö Interactive project • The tool for mapping the tribe members will be given to the client for future use • User Manual will be included along with the rest of the files 31

  33. Thank you! We welcome any questions or comments :)