Test beam 2004 - crystal tests using E0’

Test beam 2004 - crystal tests using E0’. Possibility of new crystal producers for both Barrel and Endcap

sivan
Download Presentation

Test beam 2004 - crystal tests using E0’

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test beam 2004 - crystal tests using E0’ Possibility of new crystal producers for both Barrel andEndcap Need to appraise crystals from these producersOf particular concern: crystal response to irradiationBCTP and SIC have recently produced EE crystalsSIC crystals show a 25-30% additional light yield compared to BCTPApatity (North crystals) to produce a few crystals, by end April Proposal:Use test beam from May 27th to appraise crystalsConstruct 1 SC array with Russian and Chinese crystals, mounted on E0’Crystals to be pre-irradiated and sorted for the SCRead out with 25 channels of MGPA electronics (SM1) from 2003 Irradiate crystals at H4Follow LY and monitoring response in detail Objectives: To establish whether the crystals meet the CMS ECAL technical requirementsClearance to place contracts for crystals by summer 2004 D Cockerill (RAL), ECAL TCG

  2. Basic EE Hardware Needs for Crystal Beam Tests - May 2004 Working assumptions (06-Apr-04): • 1 EE supercrystal containing 15 SIC, 8 BCTP & 2 Apatity crystals • The supercrystal will be built at CERN • We will use (up to) 25 channels of 2003 ECAL Electronics chain • Beam starts May 27th • Goal is to have the bare supercrystal ready for HV boards by Apr 26th • All hardware for one bare supercrystal must be at CERN by the Friday after Easter, 16 April D Cockerill (RAL), ECAL TCG

  3. Preparation Responsibles: EA - Etienette Auffray, CERN KWB - Ken Bell, RAL DJAC - Dave Cockerill, RAL DB – David Bailleux, Minn MD - Marc Dejardin, Saclay MH – Maurice Haguenauer, LLR RB – Robert Benetta, CERN PSF - Paul Flower - RAL HFH - Helen Heath - Bristol PL - Pierre Lecomte - ETHZ ABL - Tony Lodge, RAL JR - John Rander, Saclay BJS - Brian Smith, RAL TA1 - CERN-PH TA1 group VP – Vladimir Postoev, INR VG – Viatcheslav Grishin (Slava), IHEP IA – Alexander Inyakin, IHEP D Cockerill (RAL), ECAL TCG

  4. E0’ • E0’ moved to bldg 11 on 30 March to be connected to full ECAL R/O chain • E0’ currently equipped with one prototype SC – to be replaced • Work ongoing by MD, RB, AL • Umbilical connected to Motherboard (with the ‘any 5’ trigger ordering) • 25 channels MGPA VFE + FE card (SM1, 2003) = one barrel tower • Blue LED pulses to front of crystals, one at a time • Signals seen in correct order by full readout chain • noise ~ 2 ADC channels, work in progress Possibility to inject light into each crystal separately from front D Cockerill (RAL), ECAL TCG

  5. Supercrystal assembly Hardware (needs+spares): SC crystals 25+5 EE crystals - EA SC mechanics + VPTs  1+1 Alveoles - 3 already at CERN - BJS/TA1  25+5 Tyveced Front Inserts - 75 already at CERN - BJS/TA1  1+1 sets of Rear Inserts - 3 sets already at CERN - BJS/TA1  1+1 Interface Plates - 3 already at CERN - BJS/TA1  1+1 Housings - 3 already at CERN - BJS/TA1  25+5 VPTs - ~48 already at CERN - DJAC 1+1 calibrated thermistors & cables (what connectors?) - PSF D Cockerill (RAL), ECAL TCG

  6. Supercrystal assembly + umbilical SC mechanics + VPTs (contd) Glue for Rear Inserts - already at CERN - BJS/DJAC Glue dispensors for Rear Inserts - already at CERN - BJS/DJAC RTV Glue for VPTs - on order in the UK - BJS Glue dispensors for VPTs - ??? - BJS/DJAC  2 Glueing Jigs for VPTs to crystals - already at CERN - DJAC  10 Centering tubes/weights for glueing - already at CERN - BJS/DJAC Bar-code reader for crystal serial numbers (or temporary labels???) - DJAC Jig for manipulating alveolar during construction – ETH-Z/PL  Supercrystal lifting "handle" - already at CERN - DJAC SC umbilical 5+2 HV boards - presently at RAL - ABL 1+1 umbilical signal looms - ABL 1+1 umbilical HV (SHV) cable pairs - ABL Test gear for supercrystal soak test at CERN - ABL/HFH/DJAC/KWB/VP/VG/AI D Cockerill (RAL), ECAL TCG

  7. E0’ Monitoring  50 Porte-Ferrules - already at CERN - BJS/DJAC  Tooling for Porte-Ferrules - already at CERN - BJS/DJAC  1 Level-1 EE fibre optic harnesses - 1 presently on E0’ at CERN - BJS/JR Laser(s)/photo-diodes/MEMs/mating-pieces-to-photo-diodes etc etc - JR??? E0’ mechanics  1+1 positional spacers - already at CERN - DJAC  E0prime support backplate & related ironmongery & cooling plates - already at CERN - DJAC  Mounting bolts & shoulder bolts - already at CERN - DJAC E0prime thermal enclosure, already at CERN, extra insulation – TA1 Support to mount E0prime system onto test beam turntable - TA1 design/ fabricate Readout  HV system for beam tests - KWB EE Mothercard/connectors/pigtail - ABL Full readout chain, LV system, MEM, etc - MD  1 set of EE cooling bars & related mechanics etc - already at CERN - JAH D Cockerill (RAL), ECAL TCG

  8. Test beam meetings/H4 Wed 14 April Test Beam Mtg, Yves Sirois - follow on from PRS, at ~ 16.00 - choice of crystals - irradiation procedure • Use of 6 days of beam for 25 crystals • Start up requirements (DAQ setup, laser setup) • Beam size, rate, calibration points • Shift list + test beam web page for 2004 • Laser system at H4 – expected to be ready by Mon April 19 • Optical cables from CR to area – currently those from 2003 • Cooling system + interlocks – to be discussed • 10 SHV cables to be laid from CR to area D Cockerill (RAL), ECAL TCG

  9. Test beam SPS MD 10.00 Wed 26 May – 10.00 Thu 27 May Beam 10.00 Thu 27 May – 10.00 Wed 2 June (~ 6 days) 25nsec beam 08.00 Mon 7 June – 08.00 Mon 14 June Shutdown 08.00 Mon 14 June – 08.00 Sat 19 June Beam 08.00 Sat 19 June – 08.00 Wed 30 June (~10 days) D Cockerill (RAL), ECAL TCG

  10. E0’ – corresponding SCs in CMS Spacer numbering Column, Row 5,5 6,5 5,4 6,4 D Cockerill (RAL), ECAL TCG

  11. Angles at CMS 737.67mm 587.31mm 3179 mmIP to front of EE  = 38.526 o q = 16.521 o IP D Cockerill (RAL), ECAL TCG

  12. Angles for E0’, Y-Z plane Y  = 10.47o Beam 587.31mm 3179 mmIP to front of EE Z D Cockerill (RAL), ECAL TCG

  13. Angles for E0’, X-Z plane X  = 13.06o Beam 737.67mm 3179 mmIP to front of EE Z D Cockerill (RAL), ECAL TCG

  14. E0prime backplate & SCs 250mm 352mm Position of middle of array, 390mm forwards from backplate, with respect to backplate edges D Cockerill (RAL), ECAL TCG