1 / 5

TEL62 project update

TEL62 project update. Elena Pedreschi INFN-Pisa. TEL62. Status: 2 PCBs received 2 weeks ago 1 is almost assembled Should be in Pisa Friday Initial (acceptance) tests will start next week Power JTAG chain Clock distribution FPGA functional test CCPC boot and connection to Glue Card

skah
Download Presentation

TEL62 project update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEL62 project update Elena Pedreschi INFN-Pisa

  2. TEL62 • Status: • 2 PCBs received 2 weeks ago • 1 is almost assembled • Should be in Pisa Friday • Initial (acceptance) tests will start next week • Power • JTAG chain • Clock distribution • FPGA functional test • CCPC boot and connection to Glue Card • DDR2 and QDRI • Complete test requires some time … TDAQ 6-4-2011

  3. Pictures • PCB Top TDAQ 6-4-2011

  4. Pictures • PCB Bottom TDAQ 6-4-2011

  5. Pictures • PCA Bottom (from assembly company) TDAQ 6-4-2011