Chapter 15 Planning for Material and Resource Requirements. IDS 605 BUSING. Alternative Process for Developing a Master Production Schedule. Transparency 15.5. (Exhibit 15.6). Material Requirements Planning.
E N D
Chapter 15Planning for Material andResource Requirements IDS 605 BUSING
Alternative Process for Developing a Master Production Schedule Transparency 15.5 (Exhibit 15.6)
Material Requirements Planning • Planning for all the parts and components necessary to support the master production schedule (MPS). • MRP tells us for “how much” and “when” to launch replenishment orders for dependent demand items (i.e., it is time phased) • MRP record processing has several required pieces of information
Information Required for MRP Record Processing • Bill of Material • Current Inventory Status Data • on hand • scheduled receipts • Master Production Schedule (MPS) • Planned Lead Time Information • Order Policy • minimum (minQ), multiple (Q=), lot-for-lot (LFL)
Exploded View ofMaine Woods’ Tricycle Transparency 15.11 (Exhibit 15.13)
Product Structure Tree Diagram for Maine Woods’ Tricycle Transparency 15.12 (Exhibit 15.14)