An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 15Planning for Material andResource Requirements IDS 605 BUSING

  2. Alternative Process for Developing a Master Production Schedule Transparency 15.5 (Exhibit 15.6)

  3. Material Requirements Planning • Planning for all the parts and components necessary to support the master production schedule (MPS). • MRP tells us for “how much” and “when” to launch replenishment orders for dependent demand items (i.e., it is time phased) • MRP record processing has several required pieces of information

  4. Information Required for MRP Record Processing • Bill of Material • Current Inventory Status Data • on hand • scheduled receipts • Master Production Schedule (MPS) • Planned Lead Time Information • Order Policy • minimum (minQ), multiple (Q=), lot-for-lot (LFL)

  5. Exploded View ofMaine Woods’ Tricycle Transparency 15.11 (Exhibit 15.13)

  6. Product Structure Tree Diagram for Maine Woods’ Tricycle Transparency 15.12 (Exhibit 15.14)