1 / 13

From Particle Physics @ CERN to Particle Physics @ the industry

from technology to innovation. From Particle Physics @ CERN to Particle Physics @ the industry. ATLAS, CMS, LHCb and ALICE Career Networking Event 2017 Nancy TANNOURY 13/11/2017. Resume.

slouis
Download Presentation

From Particle Physics @ CERN to Particle Physics @ the industry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. from technology to innovation From Particle Physics @ CERN to Particle Physics @ the industry ATLAS, CMS, LHCb and ALICE Career Networking Event 2017 Nancy TANNOURY 13/11/2017

  2. Resume • 2009: Master II in “theoretical Physics and Mathematics, Particle and Astro-Particle Physics” at AIX-Marseille University • 2012 : Thesis on “b-jet tagging efficiency calibration and measurements of top quark pair relative differential cross section with ATLAS in pp collisions @ √ s = 7 TeV” at AIX-Marseille University • 2014 : Postdoc on “Search for the Higgs boson decaying hadronically into two b-quarks” at PhysikalischesInstitut, Universität Bonn. Passionate Particle Physicist and NOT ready to leave the field

  3. The Transition • YES, you can still be a Particle Physicist outside of the academic field • Today : ~ 30 000 accelerators operational world-wide • Industry and Medicine • ~ 20 000 used for industrial applications • ~ 10 000 used for medical applications • Source: World Scientific Reviews of Accelerator Science and Technology -A.W. Chao • LESS THAN A FRACTION OF A PERCENT is used for research and discovery science … • YOU are the less than a fraction of a percent!

  4. PMB - ALCEN • 2014 - present : Particle Physicist @ PMB - ALCEN • PMB head quarters are based in Peynier, south of France, and has also a subsidiary in Tunisia, based in Sousse. France Spain Italy Tunisia

  5. PMB - ALCEN • PMB - ALCEN • 151 employees • 2 manufacturing sites: Peynier, France and Sousse, Tunisia • Markets: Medical, Defense & Security, Nuclear power, Research, Industry • Products and services: • Ceramic-metal mechanical assemblies and subassemblies • High-frequency components • High-power couplers • Components for X-ray tubes • Linear Accelerators for Non-Destructive Testing & Radiotherapy • Cyclotrons • Maintenance and repairs

  6. PMB - ALCEN • PMB - ALCEN • 151 employees • 2 manufacturing sites: Peynier, France and Sousse, Tunisia • Markets: Medical, Defense & Security, Nuclear power, Research, Industry • Products and services: • Ceramic-metal mechanical assemblies and subassemblies • High-frequency components • High-power couplers • Components for X-ray tubes • Linear Accelerators for Non-Destructive Testing & Radiotherapy • Cyclotrons • Maintenance and repairs

  7. PMB – ALCEN: Electron Linear Accelerator ORIATRON: High Energy X-ray generator from 3 MeV to 9 MeV • Applications • NDT • Medical • Scientific • Security • Sterilisation

  8. PMB – ALCEN: Electron Linear Accelerator • In house beam line components manufacturing • RF tuning and network analysers • In house full linac assembly • Dedicated bunker for Linac testing

  9. PMB – ALCEN: Cyclotron iMiGiNE: Automated Radiotracer Production System for PET imaging Production of isotopes + automated radiochemistry lab

  10. PMB – ALCEN: Cyclotron • iMiGiNE • Improve clinical diagnosis • New grounds for further research in molecular imaging and nuclear medicine • ISOTRACE Cyclotron: • Accelerates protons to 12 MeV • He-free superconducting magnet • Compact and lightweight • Self-Shielded • Four external targets

  11. PMB – ALCEN: Cyclotron

  12. The Transition • Currently: • Particle-Matter interaction expert • Monte Carlo simulations for particle transport • Shielding and radiation protection design for cyclotrons and Linacs • Target design for cyclotrons and Linacs • Project Manager on Linac and accelerating sections • Meet with customers to take detailed ordering briefs and clarify specific requirements • Plan the project and divide into tasks • Delegate the tasks to the skilled individuals • Meet budgetary objectives and make adjustments to project constraints based on financial analysis • Deal with deadlines

  13. KEYWORD • NETWORK: • Learn how to network • KEEP your network alive

More Related