1 / 14

NB Cell Changes

NB Cell Changes. Kick-off meeting ORE Garching 10/10/2006 A.Tanga. Main points of NB cell. Design Review in progress 14.06 and next in November, new baseline in 2007. Interfaces critically important RH-maintenance considerations Definition of scenarios Need of input data/assumptions.

snowy
Download Presentation

NB Cell Changes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NB Cell Changes Kick-off meeting ORE Garching 10/10/2006 A.Tanga

  2. Main points of NB cell • Design Review in progress 14.06 and next in November, new baseline in 2007. • Interfaces critically important • RH-maintenance considerations • Definition of scenarios • Need of input data/assumptions

  3. Non RH Activities • NB cell extra beams: Inspections, Leak test, pipe disconnection, (pump replacement), cable-bus bar disconnection/connection, exchange of equipment, VVPSS rupture disc inspection-exchange, valve replacement. • NB cell top tubes. To be specified. NB: Remove/re-install shield, remove/re-install connections, bring in equipment for safety such as barrier, tents, disassemble the high voltage line of the DNB, revision of the scheduled maintenance of the source due to RF choice and elimination of filaments, only Cs oven re-filling. NB: Accident recovery scenario such as water leak in an injector.

  4. Conclusions • The work on NB cell integration to be finalized by year end to make the new baseline. Next year more detailed analysis. • Basic activities can be defined at this stage. • Interface with RH task.

More Related