Start with a Vision in Mind BP Greater Plutonio Project

PELC Conference 2005. Start with a Vision in Mind BP Greater Plutonio Project. 7 th April 2005. Andy Till Angola DCT Program Manager BP Exploration. Background. Block 18 – 6 deepwater fields operated by BP FPSO – Floating production, storage & offloading vessel 300m Long , 250kbbls / day

sonel
Download Presentation

Start with a Vision in Mind BP Greater Plutonio Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PELC Conference 2005 Start with a Vision in MindBP Greater Plutonio Project 7th April 2005 Andy Till Angola DCT Program Manager BP Exploration

  2. Background • Block 18 – 6 deepwater fields operated by BP • FPSO – Floating production, storage & offloading vessel • 300m Long , 250kbbls / day • EPCm contract with Kellogg Brown & Root, UK • FPSO Hull built by Hyundai Heavy Industries, Korea • First Oil Q2 2007 • BP investment of $3.3b

  3. Learning Cycle • Planning • Standards • Specifications • Doing • Contracts • Data Collection Tools • Reflecting • Assurance • Audit • Linking • Cleansing • Correction • Vision • Planning

  4. GPP Information management (Planning) • Define Statement of Requirements during early stages of project (pre-feed) • Agree standards i.e. ISO 15926 • Agree project data and document requirements • Write the requirements in to the contract • Handover requirements (Responsibilities / Accountabilities) • Detailed standards (numbering / handover) • Clear Data Model • Early Visibility of Data

  5. Core Data Model

  6. V Document Vault Document Vault Oracle Data Vault Oracle Data Vault - Processes Engineering Data & Relationships Document Meta-Data Supplier SDRL Documents Supplier Electronic Documents SDRL Document Register EIHS Templates and SDRL Data Requirements Data Collection (Doing) Import or Data Entry Document Posting/ Review Suppliers ICT Phasset P-H Documentum Propid KBR

  7. Close collaboration with: (Reflecting) • KBR – EPCm Contractor • Pearson-Harper – Validation and Content & Data Collection Tool • Aveva – 3D Model & Engineering Portal People Process Technology

  8. The Learning Cycle (Revised)

  9. What is your paradigm? Electronic Data & Documents Single window Global Access

  10. Status of deliverables

  11. People Process Technology Conclusion • Write requirements in to the contract (2 Years 3 months to polish the data) • Comprehensive information set available for HUC and Operations (required detail in EIHS) • Confidence the information set will be complete for 1st Oil (data has been validated) • Any electronic system is only as good as the data entered (consistency and cleansing) • Angola has only scratched the surface of possibilities • Have a Vision