1 / 6

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report for January 2014 Date Submitted: January 2014 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC

Download Presentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report for January 2014 Date Submitted: January 2014 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: +1 480-586-8457, E-Mail: cpowell@ieee.org Re: TG10 (L2R) Closing Report for January 2014 Plenary Abstract: Closing Report for the TG10 (L2R) Sessions in Los Angeles Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

  2. 802.15 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing 802.15.4 Mesh Networks.

  3. Meeting Goals/Status • Recap Nov. 802.15 Plenary and Current Status • Prepare for Joint Session w/ 802.1 • Hold Joint Session w/ 802.1 • Hear Presentation(s) • Continue Work on Tech. Guidance Doc.

  4. Accomplishments • Prepared Material for Joint Session w/802.1 • Held Joint Session/Discussion w/802.1 • Revised Tech. Guidance Doc. (# 15-13-0753-02) • Merged in System Req. Spec. • Reviewed Timeline(changes to be reflected in doc. # 15-13-0645-02) • Heard (1) Presentation • Minutes(# 15-14-0070-00)

  5. Looking Forward Between Now and Beijing (March 2014) • Complete Tech. Guidance Doc. At Beijing (March 2014) • Review and Finalize Tech. Guidance Doc. • Prepare Call for Preliminary Proposals • Revisit Timeline Next Juncture w/802.1 • After Hearing Preliminary Proposals

  6. Conference Calls • Conference Call Info • 1st Call : Wed. 5th, Feb. • Recurrence: Weekly • Time: Wed. 2PM (Pacific) Wed. 10PM (London) Thurs. 7AM (Tokyo) • Conf. Call #: To Be Sent to TG10 Reflector

More Related