Airport Obstructions Standards Committee

Airport Obstructions Standards Committee. FAA Broadcast On Precision Obstacle Free Zone (POFZ) Implementation. Agenda. Introduction Broadcast Objectives AOSC Background Overview of POFZ POFZ Examples ARC-1 Memo to RAPTs Frequently Asked Questions Questions & Answers.

sora
Download Presentation

Airport Obstructions Standards Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airport Obstructions Standards Committee FAA Broadcast On Precision Obstacle Free Zone (POFZ) Implementation

  2. Agenda • Introduction • Broadcast Objectives • AOSC Background • Overview of POFZ • POFZ Examples • ARC-1 Memo to RAPTs • Frequently Asked Questions • Questions & Answers

  3. Broadcast Objectives • Develop common understanding of POFZ requirements • Provide clarifying guidance to regional teams • Discuss associated implementation issues

  4. AOSC Background • Chartered May 2003 • The AOSC works across FAA lines of business to transform outdated, inconsistent obstruction standards practices to future policy that optimally balances operational safety, effectiveness, and economic benefit

  5. AOSC Steering Group • Reports to Deputy Administrator, ADA-1 • AOSC Steering Group Membership • Ruth Leverenz, ARC-1 • Catherine Lang, ARP-1 • Russ Chew, ATO-1 • Nick Sabatini, AVS-1

  6. AOSC Decision Documents • DD01 - POFA and Runway Separation, dated 12/18/03 • DD02 - 40:1 Departure Surface, dated 9/13/04 • DD03 - Atlanta End-Around Taxiway (Departure Only), dated 7/12/04 • DD04 - Runway / Parallel Taxiway Separation Standards, dated 03/21/05 • DD05 - Airport Traffic Control Tower Interim Siting Guidance, dated 06/08/05 • DD06 - Dallas / Fort Worth (DFW) End-Around Taxiway System, dated 06/08/05 www.aosc.faa.gov

  7. POFZ Introduction POFZ protects the area of short final area during very low ceilings (<250’ feet) and or visibilities (<3/4 Sm or < 4000’ RVR) P TERPS 34:1 area 400’ O Final Approach 2 4 F “W” Surface 400’ Z 200’

  8. POFZ Applicability • The requirement to clear the POFZ applies when an aircraft on a vertically guided final approach is within 2 nautical miles of the runway threshold and the reported ceiling is below 250 feet and/or visibility less than ¾ SM (or runway visual range below 4,000 feet).

  9. POFZ Applicability (Cont’d) • The POFZ is considered clear even if the wing of the aircraft holding on a taxiway waiting for runway clearance penetrates the POFZ; however, neither the fuselage nor the tail may infringe on the POFZ. • If the POFZ is not clear, the MINIMUM authorized height above touchdown (HAT) and visibility is 250 feet and ¾ statute mile (SM).

  10. POFZ Compliance • In the approved AOSC Decision Document #01, the requirement was set for the POFZ guidance to be applied uniformly to all airports nationally by January 1, 2007 • It was further noted that “any airport that fails to meet the POFZ guidance by that date will not have its procedures approved at their next subsequent biennial review”.

  11. POFZ Examples

  12. P O F Z S P R E T

  13. T E R P S P O F Z

  14. T E R P S P O F Z

  15. TERPS P O F Z

  16. ILS Critical POFZ TERPS

  17. POFZ TERPS TERPS POFZ POFZ TERPS T

  18. ARC-1 Memo to RAPTs (12/16/05) • Less than a year remains before the POFZ implementation deadline • Help is needed to ensure that implementation strategies are developed and the necessary actions are taken at any affected airports. • Implementation oversight by the Region is critical to successful implementation • Regional Airspace Procedures Team (RAPT) support is needed

  19. ARC-1 Memo to RAPTs (12/16/05) Cont. • Specifically, the AOSC requested (by February 28, 2006) the RAPT to: • Review the requirements outlined in AOSC Decision Document #01 (attached) to keep the POFZ clear under the specified conditions and determine the appropriate method of compliance for each runway end with a current or near-term planned precision approach. • Identify the locations where additional markings/signage are needed and a target date for completion • Follow-up by the RAPT toward the end of 2006 may also be needed to ensure that the necessary actions are completed by the January 1, 2007 deadline.

  20. POFZ Reference Material • AOSC Decision Document #01 • Advisory Circular 150/5340-18D “Standards for Airport Sign Systems” • Advisory Circular 150/5340-1J, “Standards for Airport Markings” • Airport Certification Program Policy and Guidance, Policy #88 • FAA Order 7110.65R, “Air Traffic Control” (Section 3-7-6) • FAA Order 7210.3R, “Facility Operation and Administration” (Section 10-1-12) • ATO training briefing • Aeronautical Information Manual (Section 5-4-20b)

  21. Frequently Asked Questions • Does POFZ apply to GPS WAAS approaches? • The POFZ applies to any approach with ceiling below 250 feet and/or visibility below 3/4 of a statute mile or below 4,000 RVR. • Does POFZ apply at military airports? • The POFZ applies at joint-use facilities. • How do we determine the 250 foot ceiling requirement? • The reportable values from appropriate weather sources should be used to determine ceiling height.

  22. Frequently Asked Questions • How do we apply POFZ at non-towered airports or towers that have limited hours? • Pilots will be notified of POFZ requirements at all airports (including non-towered airports) through the Aeronautical Information Manual (AIM). Hold lines should be placed at the most conservative location to protect both the POFZ and the ILS critical area. Pilots are required to understand and comply with these markings.

  23. Frequently Asked Questions • Who will fund modifications to the airport environment (marking, signage, concrete)? • ARP, working with the sponsor, should be developing funding plans for the necessary modifications. However any extensive work requiring multi-year funding should be reported though the RAPT to the AOSC.

  24. Frequently Asked Questions • Can the implementation date be deferred? • Any requests for deferral will be considered at the AOSC executive steering group level). • Every effort needs to be made to meet the deadline and each RAPT should report implementation concerns as soon as possible. • If an airport is not able to comply by 1/1/07, is it an option to increase the published minima to 250 feet and ¾ statute mile? • Yes, that is an option.

  25. Frequently Asked Questions • Are vehicles allowed to penetrate the POFZ when the POFZ is active? • The POFZ should be protected from all obstacles. The only exception is a wing of a taxiing aircraft. This can be enforced by a hold sign on a road or other agreement with the airport operator

  26. Additional Questions & Answers