1 / 15

UMR Rock Island District 2012

April, 17, 2012. UMR Rock Island District 2012. Overview. Hydraulic Dredging Mechanical Dredging Additional Items 2012 plans DMMP’s Cave Hollow Keithsburg Finley's/Hurricane FWS – Pool 15 Mussel Restoration. UMR Hydraulic Dredging. Pool 22 Cave Hollow RM 306

sorley
Download Presentation

UMR Rock Island District 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. April, 17, 2012 UMR Rock Island District 2012

  2. Overview • Hydraulic Dredging • Mechanical Dredging • Additional Items • 2012 plans • DMMP’s • Cave Hollow • Keithsburg • Finley's/Hurricane • FWS – Pool 15 Mussel Restoration

  3. UMR Hydraulic Dredging Pool 22 • Cave Hollow RM 306 • Mechanical Beneficial Use • Pool 21 • LaGrange RM 336 • Hogback RM 332 • Pool 20 • Buzzard RM 349 • Pool 18 • Keithsburg Lower RM 426

  4. Pool 21 – Hogback RM 332 (1)Mechanical - Sept • Amount Dredged: • 2,973 cy • Placement Site: • Thalweg RM 330.8 • Dredging Depth: 11’ • Beneficial Use: No • Water Quality Monitoring: Per MODOC and ILDNR

  5. Pool 21 – Hogback (2&3)Hyd. Dredge Goetz – Oct & Nov • Amount Dredged: • 2 – 28,325 cy (had to suspend to do Keithsburg) • 3 – 35,925 cy • Placement Site: • 2 – Bankline RM 331.5-331.8L • 3 – Thalweg RM 330.9 • Dredging Depth: 11’ • Beneficial Use: No • Water Quality Monitoring: Per MODOC and ILDNR

  6. Pool 21 – LaGrange RM 336 • Amount Dredged: • 48,705 cy • Placement Site: • Bankline stockpile RM 336.2 – 336.5R • Dredging Depth: 11’ • Beneficial Use: No • Water Quality Monitoring: Per MODOC

  7. Pool 20 – Buzzard RM 349 (1&2)Mech (1) & Hyd Dredge Goetz (2) • Amount Dredged: • 1 – 8,419cy • 2 – 57,102 • Placement Site: • 1 – Thalweg RM 348.6T • 2 – DMMP Stockpile RM 348.8-349.1R • Dredging Depth: 11’ • Beneficial Use: Yes • Water Quality Monitoring: Per ILDNR & MODOC

  8. Pool 16- Lock 16 Lower • Amount Dredged • 14,235 yards • Placement Site • Bankline stabilization, RM. 456 • Dredging Depth 11’ • Water Quality Monitoring Per ILDNR

  9. Pool 16 – Buffalo RM 472 (Mech) • Amount Dredged: • 3,907cy • Placement Site: • Pocket Beaches RM473 L & Buffalo Shores RM471.6R • Dredging Depth: 11’ • Beneficial Use: Yes • Water Quality Monitoring: Per ILDNR

  10. Pool 16 – Linwood/Horse Island RM 475.7-476.2 (Mech) • Amount Dredged: • 33,955 cy • Placement Site: • Buffalo Shores/Beach RM 471.8 &472.6R and Cent. Bridge RM 482.0 L • Dredging Depth: 11’ • Beneficial Use: Yes • Water Quality Monitoring: Per IADNR

  11. Pool 16 – Lock 15 Lower RM 482.5 (Mech) • Amount Dredged: • 5,317 cy • Placement Site: • Cent. Bridge RM 482.0 L • Dredging Depth: 11’ • Beneficial Use: Yes • Water Quality Monitoring: Per ILDNR

  12. 2012 Miss Rvr Dredging • Pool 11 • Turkey River RM 609 • Hurricane RM 599 • Finleys RM 596 • Pool 12 • Island 241 RM 562 • Pool 13 • Sabula Lower RM 533 • Dark Slough RM 531 • Pool 14 • LeClaire Canal RM 494 • Pool 16 • Linwood/Horse Island RM 475 • Lock 15 Lower RM 483 • Pool 17 • Bass Island RM 477.5 • Pool 18 • Keithsburg Lower RM 425 • Oquawka RM 415 • Furnal Island RM 448 • Pool 19 • Burlington Bluff RM 401 • Kemp’s /Craigel RM 400 • Pool 20 • Lock 20 Upper 343 • Pool 21 • Lonetree RM 331 • Hogback RM 332 • Pool 22 • Whitney Island RM 314 • Turtle Island RM 312 • Cave Hollow RM 306

  13. LaGrange Pool-Copperas Creek • Amount Dredged • 48,400 yards • Placement Site • Bankline stabilization, RM. 136.5-137.1 • Dredging Depth 11’ • Water Quality Monitoring Per ILDNR

  14. LaGrange Pool-Beardstown • Amount Dredged • 25,000 • Placement Site • Beneficial Use, RM. 87 • Dredging Depth 11’ • Water Quality Monitoring Per ILDNR

  15. 2012 Ill Rvr Dredging • Marseilles • Dresden Lower, RM. 271, 8,700 yds. • Grist Island, RM. 259, 15,000 yds. • Starved Rock • Bull’s Island Upper, RM. 241, 2,300 yds. • Peoria Pool • Starved Rock Lower, RM. 229, 18,600 yds. • Illinois Power, RM. 212, 5,000 yds. • Henry, RM. 196, 5,000 yds. • Senachwine Creek, RM. 181, 5,000 yds. • Dresden Pool • Treat’s Island, Rm. 279, 8,000 yds • LaGrange Pool • Mackinaw River, RM. 147, 55,000 yds. • Kingston Mines, RM. 146, 35,000 yds. • Beardstown, RM. 88, 65,000 yds. • Brigg’s Landing, RM. 84 35,000 yds.