An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIS DEVELOPMENTS AT FEA E. Naitini 24.11.2010

  2. CONTENTS • INTRODUCTION • USING FEA_GIS • HIGHLIGHTS FOR 2010 • FUTURE PLANS • CONCLUSION

  3. INTRODUCTION • GIS reintroduced to fea in 2004 • SOPAC assistance GPS and GIS training

  4. Completed field data capture VitiLevu and Ovalau • FEA_GIS stores Overhead Line Distribution System info, capture maintenance works records, Underground Cable system info etc.

  5. USING FEA GISNetwork Design • Designs new extension / upgrades to existing Dist. System

  6. Preliminary design can be done from office

  7. Ability to combine different data sets; satellite images, topo maps, scheme plans (CAD) from Developer makes GIS important tool for Designers.

  8. Major Projects • Proposed Nadarivatu – Nacocolevu 132kV Transmission Line. • GPS coordinates from Engineers > map onto GIS > overlay with NLTB data > identify land owning units.

  9. Distribution Team • FEA_GIS used to plan and capture maintenance works, locating assets in the field when attending to faults, part of reports. • Now part of the requirement for planned shutdowns to include GIS map.

  10. Distribution Team • New poles for new schemes have PoleID tags to number on site. • Data capture of new extensions to the grid

  11. ICT • Optic fibre for communication and SCADA needs of FEA. • FEA_GIS used to determine best route to follow > calculate distance, materials, labor and cost.

  12. HIGHLIGHTS OF 2010 • Nadarivatu optic fibre

  13. Streetlight audit

  14. CYCLONE RESTORATION

  15. FUTURE PLANS • Started capturing consumer meters. • Network modeling, load flow on GIS • MapInfo good for introducing GIS to FEA, currently meeting needs of users • Enterprise wide GIS.

  16. CONCLUSION • What more can be offered? • Databases • Capturing consumer meters • On going training on how to use FEA_GIS

  17. Acknowledgements • SOPAC • NLTB • USP • Lands Department • GIS user group

  18. VINAKA ???