1 / 12

Systems Development

Systems Development. Joseph Jackson Walter Wong. Imminent Deployment. Initial Directory Deployment Majordomo SIEVE/Vacation. Notes. All dates are system group completion dates. Deployment date is probably 1-2 months in advance of the completion date. Cyrus Projects.

soyala
Download Presentation

Systems Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systems Development Joseph Jackson Walter Wong DRAFT

  2. Imminent Deployment • Initial Directory Deployment • Majordomo • SIEVE/Vacation DRAFT

  3. Notes • All dates are system group completion dates. Deployment date is probably 1-2 months in advance of the completion date. DRAFT

  4. Cyrus Projects • Authenticated bboard posting (9/1/01) • Relay mail if authenticated (5/1/01) • Aggregator deployment (7/1/01) • Bboard switchover (1/1/02) • Delivery cutover (6/1/01) • Other improvements to performance, scalability, manageability (8/1/02) • AMS Phase-out(2/1/02) DRAFT

  5. Orpheus Projects • Management of user desktops (1/1/02) • Initial version only • Monitoring and Management of servers(4/1/02) • Initial version only • Server authentication/authorization integration (file sharing, IIS, SQL) (7/1/02) • OS Upgrades • Windows XP to clusters (10/1/01) • Roaming profiles (preference info) (5/1/01) DRAFT

  6. Andrew/Unix Projects • Solaris 2.9 Upgrade (8/1/02) • RedHat 8.x Upgrade (8/1/02) • Mac OS X (8/1/02) • Final removal of obsolete OS (1/1/02) • Ultrix, SunOS 4.1.3, Solaris 2.5.1, Solaris 2.6., HPUX, RedHat 4.2 DRAFT

  7. Security Projects • PKI Junk Cert Pilot (8/1/01) • Default Kerberos 5 (1/1/02) • Authorization Server (5/1/02) • Turn off plaintext passwords (5/1/02) • Active and Passive Detection (12/1/01) • Enforce strong passwords (5/1/02) DRAFT

  8. Admin Support Projects • Monitoring framework (1/1/02) • Improved console • Automated paging • System data archival and viewing (1/1/02) • http://graphs.andrew.cmu.edu (pilot) • User counts, email messages sent, machine room temperature/humidity, etc. • Backup tape library • AFS, Cyrus, Amanda (8/1/02) • Automating restores (12/1/02) DRAFT

  9. Calendar Projects • Server upgrades (8/1/01) • Client upgrades (8/1/01) • Data integration (8/1/01) • Add students (5/1/01) DRAFT

  10. File System Projects • OpenAFS NT (5/1/01) • OpenAFS Mac OS X (8/1/01) • Other file systems evaluation (6/1/01) • Web upload/download fs • Native OS filesystems DRAFT

  11. Evaluations • BXXP for ACAP functionality (12/1/01) • No Passwords used (9/1/01) • Smart card; biometrics; etc. • Web access to personal IMAP folders (7/1/01) • Web access to IMAP bboards (4/1/01) DRAFT

  12. Continual Upgrades • AFS client/server • Mulberry client • Operating systems (Mac, Windows, Unix) • All core server products (web, directory, calendar, etc.) DRAFT

More Related