Pipeline Safety and Reauthorization

This conference presentation discusses the perspective of liquid pipeline operators on pipeline safety, accidents and prevention measures. It highlights key causes of accidents, industry efforts to learn from accidents, and the role of regulatory agencies in promoting safety. The presentation also emphasizes the need to focus on protecting against the greatest risks and avoiding security vulnerabilities.

sparksj
Download Presentation

Pipeline Safety and Reauthorization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pipeline Safety and Reauthorization Pipeline Safety Trust conference November 4, 2010

  2. Perspectives of liquid pipeline operators • No accidents are acceptable • Safety record has improved over the decade • Inside and outside HCAs • All leading causes (corrosion, equipment, materials/seams, operator error, excavation damage) • “AnnusHorriblus” • Major project (Keystone XL) opposed partly because of non-pipeline energy policy concerns • Deepwater Horizon, even though not a pipeline accident • And then Marshall, MI, and San Bruno, CA

  3. Perspective on the MI and CA accidents • Operators say “I don’t want that to happen to us” • Operators are eager for NTSB findings • What happened and how do we prevent it? • Will the findings identify any regulatory gaps? • Industry works to learn from accidents • PPTS, Performance Excellence Team, Data Mining Team, Pipeline Information eXchange (PIX), Safety Culture workshops • PHMSA has many tools and is not afraid to use them

  4. Incentives to avoid a release • Injury to public, employees, contractors • Clean-up costs • Claims and litigation • Penalties and fines • Reputation hurt with regulators • Lost business; reputation with shippers

  5. Dramatic Improvement:Liquids Pipeline Industry Onshore Pipe Spill Record Number of Spills per 1,000 Miles Barrels Released per 1,000 Miles -48% -63% 3-Year Averages Ending in Year Shown Source: Pipeline Performance Tracking System, a voluntary spill reporting system involving 85% of the U.S. liquids pipeline mileage. Percentage decline from 1999-2001 average to 2006-2008 average.

  6. Public concerns about ‘aging infrastructure’ • Data shows no specific trends • Some accidents on older pipe not caused by time-dependent factors • Very long lives if properly constructed, operated, maintained, and protected • Operators focus on specific construction methods, coatings, welding practices, etc. • Thankful for recognition of this by others • But we need to find a better way to explain that

  7. Focus in Reauthorization • Excavation damage prevention (One-call exemptions) • Improving the NRC telephonic notification regime • Maintain focus on protecting against the greatest risks • Any requirements should have a technical and engineering basis and enhance safety • Avoid creating security risks • Remember the leading causes of accidents are already covered by regulations

  8. PPTS Onshore Pipe Incidents '99-'08 (3-year Average) ’01 ‘08 ’01 ‘08 ’01 ‘08 ’01 ‘08 ’01 ‘08 ’01 ‘08 TOTAL, ALL CAUSES CORROSION THIRD PARTY EQUIP./NON-PIPE OPERATOR/OPER'N MAT'L/SEAM/WELD

  9. Excavation damage prevention • Causes 7% of all incidents • Leading cause of injuries and deaths • Exemptions have seemed to surprise Congress • Common message among stakeholders • Great starts in PHMSA ANPRM and S. 3856 (Lautenberg-Rockefeller)

  10. Telephonic reporting • Rigid National Response Center rules create a conflict between the need to report and the need to estimate • Operators must estimate release volume • Operators cannot revise a report • Options to make immediate reporting more practicable • Allow revisions of estimates • Estimate ranges initially, not specific amounts • A possible common goal for work together

  11. Ways we can work together • PIPA promotion • Damage prevention • States, PHMSA, Congress • Notification process reforms • Continued discussion of leading indicators and concerns • Continued discussion of perspectives

  12. Thank you Andy Black President and CEO Association of Oil Pipe Lines (AOPL) 202 292 4500 phone ablack@aopl.org www.aopl.org