Summary of NPP Land Science Team Meeting: Status, Progress, Issues

Summary of NPP Land Science Team Meeting: Status, Progress, Issues. Jeffrey Privette MODIS Land Team Meeting January 5, 2006 Baltimore. Program and VIIRS Sensor States. NPOESS Program under replan due to cost/schedule overruns Announcement of plan forward expected in ~Feb. ‘ 06

ssowell
Download Presentation

Summary of NPP Land Science Team Meeting: Status, Progress, Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary ofNPP Land Science Team Meeting:Status, Progress, Issues Jeffrey Privette MODIS Land Team Meeting January 5, 2006 Baltimore

  2. Program and VIIRS Sensor States • NPOESS Program under replan due to cost/schedule overruns • Announcement of plan forward expected in ~Feb. ‘06 • Some launch date slippage likely • VIIRS is critical path, and receiving the attention consistent with that • Two major concerns in past year appear on path to 100% resolution • Stray light on solar diffuser during calibration, and cryoradiator performance • NPP very likely moving to 1330 orbit • Cross validation opportunities with A-Train • Cloudiness analysis of a.m. vs. p.m.: roughly a draw • Aqua younger than Terra: theoretically still operational at NPP launch

  3. Recent NASA Team Activities • Land PEATE is up and running • Internal Peer Review completed in Dec. 2005 • Architectural design stable and under active procurement • NPOESS Science-grade algorithms debugged and ported • NPOESS Operational algorithm “wrapper” making good progress • Strong interaction with IDPS & CLASS on segment interfaces, data formats, intermediate and QA products, etc. definitions • Conveying EOS lessons learned • Regular interactions with other PEATEs • Build 1 on schedule for March 2006 completion • 8 MODIS PGE (cloud mask, AOT, surf refl., VI, NCEP & LCover granulation, fires, …) • 1.2 orbits of VIIRS Proxy Data converted from SSPR drop • Receive Calibration LUTs from NICSE (Jack Xiong’s calibration team at GSFC) • Etc. • Build 2 scheduled for November 2006 completion • Includes working interfaces with IDPS and CLASS elements

  4. Recent NASA Team Activities • NASA Land Team provided results/advice to partners & community • AGU 2005 Fall Meeting Special Session (22 contributions; December) • VIIRS OAT Meetings (February and September) • NPOESS Algorithm Executability Review by IPO and NGST (August) • NPP Orbit Position Paper (August) • Algorithm Risk Documents (NPP Project; June) • Land PEATE Review (September, December) • JARG NPOESS Data Source Review (October) • VIIRS Proxy Transform Drop to SSPR (MODIS-to-VIIRS; November) • SSPR Biweekly Land Telecons initiated in November 2005 • Drill down into complex and/or esoteric algorithm topics • Direct “scientist-to-scientist” interaction, conveying EOS lessons-learned • Six held to date (e.g., surface reflectance, VI compositing, (re-)gridding) • Follow Early Algorithm Assessments delivered in 2004

  5. VIIRS Proxy Data Partnership NGST Convolved AIRS Spectral Data Base IDPS System Testing & Analysis GMU MIR/LWIR Transform eqns NASA’sGSFC NPOESS Algorithm Analysis & Improvement VIS/NIR Transform eqns U Arizona NASA’s Land PEATE

  6. Proxy Data Provides “True Data” Realism MOD-VIIRS Spectral Transformation EquationM16 = a + b*31 + c*32 + d*(31-32)(sec(viewz)-1) VIIRS Proxy Data Band M16 (12 um, Δ0.95) MODIS Data Band 32 (12 um , Δ0.5) Sahara Desert, Libya Validation: Real AVHRR vs. MODIS-derived proxy AVHRR

  7. Team Issues • IDPS may have limited xDR production at NPP Launch • IPO/SSPR replan emphasizes (L1) Sensor Data Records (SDRs) • EDRs likely to be added incrementally over the life of NPP • Gap in mainstay NASA products (e.g., NDVI, Fire)? • Most Intermediate Products (internal to IDPS) not archived in CLASS • NASA community uses many for research and/or product validation (e.g., TOC NDVI, monthly gridded NDVI, BRDF, etc.)

  8. Team Issues • Onboard pixel aggregation system does not record if input values(s) are saturated • Detectors used for fire detection saturate at low temperatures • Jeopardizes quality of fire detection EDR • Remedy straightforward: downlink one M15 unaggregated • Early SSPR cost projection seemed unrealistic • Launch delay and lobbying may allow good sense to prevail

  9. To Be Determined… • 3 general types NPP data users envisioned in NASA community • ESDRs/CDRs (high quality, high latency; source: NASA CARS) • e.g., large scale climate and modeling communities • Swath EDRs (operational quality, low latency; source: IDPS) • e.g., applications, wildfire support • Gridded EDRs (operational quality, low latency; source: TBD) • e.g., FEWS • NPOESS EDRs are like EOS L2 Swath Products rather than the gridded L3 products preferred by NASA Science community • “Value added” processing is needed (stitching, compositing, QA, etc.) • NOAA developing NPOESS Data Exploitation effort for op users • NASA needs something similar for its products/users

  10. Backup • Land algorithms not applied to pixels indentified as cloud contaminated • MODIS applies alg everywhere; cloud info put in accompanying data layer • Operational users prefer not to check multiple layers (reportedly) • Misses potential opportunities to get useful information • Cloud algorithm may not be accurate, especially over snow/ice regions • Some EDR algorithms remain accurate despite presence of clouds • Not all EDRs may be affected – under investigation