110 likes | 115 Views
This presentation provides an overview of the Southampton School District's bond issue capital improvement program for phases 2, 3, and 4, including classroom additions, site renovations, toilet room reconstructions, and various interior modifications. Updates on the progress of each phase are also included.
E N D
2007 Bond Issue Capital Improvement Program PRESENTATION September 2, 2008
Southampton Elementary School – Phase 2 • New 10 Classroom Addition • New Receiving Area Addition • Addition / Alteration Main Office • Site-work Improvements • Toilet Room Reconstruction • Art Room Alteration • Computer Room Alteration • Science Room Alteration • Music and Band Room Alterations • Interior Specialty Room Alterations • Heating, Ventilation, Electrical and Plumbing Upgrades • Ceiling and Lighting Replacements
Occupational Therapy Office After Before
Fuel Oil Tank Replacement Old Tank New Tank and Piping
Corridor Ceiling Replacement New Third Floor Ceiling Existing Second Floor Ceiling New Corridor Wing Ceiling New Second Floor Ceiling
Interior Modifications at Library New Openings From Library To New Computer Rooms Stage Removed at Library
Toilet Renovations Renovated Toilet Renovated Student Toilet Renovated Faculty Toilet Renovated Nurses Toilet
Classroom Addition Site Excavation Site Demolition
Classroom Addition, Site Renovation and Playground New Parking Lot Playground Area Egress Ramp at Addition Footing Formwork
Classroom Addition WEST ELEVATION NORTH ELEVATION – NEW CLASSROOM AREA
Southampton Intermediate School – Phase 3 • SED is presently reviewing the drawings. • Architect is reviewing SED comments. • Architect to issue addendum to SED. • Bidding of Phase 2 to be in October pending SED approval. • Southampton High School – Phase 4 • Architect working on construction documents. • Final construction documents to be sent to SED beginning 2009. • SED approval to take approximately 20 to 26 weeks.