Capital Improvement Program (CIP) Overview. Nick Kanetis, P.E. June 14, 2013. OCSD Service Area 479 square miles 210 million gallons per day 2.5 million population 21 cities, 3 special districts 580 miles of sewers 15 pump stations 2 treatment plants. Los Angeles. Orange County.
E N D
Capital ImprovementProgram (CIP) Overview Nick Kanetis, P.E. June 14, 2013
OCSD Service Area479 square miles210 million gallons per day 2.5 million population 21 cities, 3 special districts 580 miles of sewers 15 pump stations 2 treatment plants Los Angeles Orange County ServiceArea San Diego
Reclamation Plant No. 1Fountain Valley Treatment Plant No. 2Huntington Beach
Background • EPA Consent Decree Secondary Treatment 2002 - 2012 • Full Secondary December 2012 • Future Renewal, Replacement and Rehabilitation
Strong Financial Position • Revenues from user fees and connection fees • Proactive forecasting and planning • AAA Bond Rating
More than 70 Projects $1.8 Billion Dollars invested in our Infrastructure
Secondary Treatment ExpansionSix EPA Consent Decree Milestones
Trickling Filters at Plant No. 2 Designer: Brown & Caldwell Contractor: J.F. Shea Construction Construction Cost: $182M - Capacity: 60 MGD
New Secondary Treatment at Plant No.1 Designer: Black & Veatch Contractor: Kiewit Infrastructure West Construction Cost: $207M – Capacity 60 MGD
Headworks at Plant No. 2 Odor Control System Demolition of Existing Headworks Designer: Carollo Eng. Contractor: J.F. Shea Construction Construction Cost: $196M - Capacity 340 MGD
Outfall Land Section & OOBS Piping Rehabilitation Designer: Black & Veatch Contractor: J.F. Shea Construction Construction Cost: $11.8
Central Generation Automation Designer: Black & Veatch Contractor: Morrow Meadows/Sachs Electric Construction Cost: $14.6M
Magnolia Trunk Sewer Rehabilitation Design/Build: Kiewit Infrastructure West Design/Build Cost: $15.5M
Sludge Dewatering & Odor Control at Plant No. 1 Exterior finish Ground level Designer: HDR Eng. Contractor: W. M. Lyles Construction Cost: $127M
Pump Stations Rocky Point Pump Station Bitter Point Pump Station Designer: Malcolm Pirnie Contractor: Kiewit Inf. West Construction Cost: $9.2M Designer: Lee & Ro Contractor: Kiewit Inf. West Construction Cost: $20.2M
100% Secondary Standards 70 mgd Reclamation Increased System Reliability Lower engine emissions Less Odors Disinfection Treat Urban Runoff Fire & Safety Code Compliance IncreasingLevel of Service
CIP DriversEnhanced Planning Methodology Capacity Level of Service or Regulatory Change Plant or Collection System Condition Of Assets Business Efficiency & Research Outcome
CIP DriversEnhanced Planning Methodology Capacity Plant or Collection System Level of Service or Regulatory Change Condition OfAssets Business Efficiency & Research Outcome
CIP DriversTransition to Rehabilitation Before Cleaning Inspection After Cleaning Lining Failure
Future Focus • Project Scope Development • Resource Forecasting • Risk Management • Emphasis on Schedules • Change Order Controls • Outreach to Cities
FY 2013-14 CIP Expenditures $141 MillionMostly Rehabilitation
Upcoming Planned Projects • Headworks Rehabilitation - $50 Million • Outfall Pump Station Rehabilitation - $20 Million • Primary Clarifier Rehabilitation - $120 Million • Digesters Rehabilitation - $50 Million • Digester Gas Facilities Rehabilitation - $40 Million • Collections Rehabilitations - $100 Million • Odor Control Master Planning - $20 Million • Admin. Facilities Master Planning - $40 Million