What Is CPM Scheduling ???

What Is CPM Scheduling ???. 1. 3. 2. CRITICAL PATH METHOD of Scheduling. CPM is a method ideally suited to the construction industry, and it provides a far more useful and precise approach.

stash
Download Presentation

What Is CPM Scheduling ???

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What Is CPM Scheduling ??? 1 3 2 CRITICAL PATH METHOD of Scheduling CPM is a method ideally suited to the construction industry, and it provides a far more useful and precise approach CPM allows the logical analysis and manipulation of this network to determine the best overall program of operation. CPM is the representation of a project plan by a schematic diagram or network that depicts the sequence and interrelation of all the component parts of the project.

  2. Why Use CPM Scheduling ??? 1 2 3 4 5 6 • Often a project awarded to • Superior Project Management • Capability • rather than on price alone • Maximized resource utilization • Decreased general conditions costs • Earlier ROI Dispute and Delay avoidance • Early Use of CPM • Shorter (Up to 10 %) • More Realistic Construction • Periods • Increased profitability • Improved communication Competitive advantage in the marketplace

  3. When CPM is Most Effective??? When ??? • An ounce of Prevention is Worth a Pound of cure. • In order to save money, you have to act before you have already spent it. The most effective time to implement a CPM Scheduling program is at the earliest stages of a project,

  4. What Benefits Does The Owner Realize From The Implementation Of CPM ??? 1 2 3 4 5 Owner The Owner stands to benefit greatly from the use of an effective planning and scheduling program. This tool provides the owner with : More accurate, concise, and clear communications which result in fewer misunderstandings and disputes. A more accurate and timely method to forecast cash flow. An effective way to coordinate their activities with those of the designer and builder. Earlier return on investment due to earlier occupancy. Higher margin of profitability.

  5. What Benefits Does The Designer Realize From The Implementation Of CPM ??? Designer 1 2 3 4 5 A key member of the building process, the Designer will realize positive benefits from a scheduling program. Improved communications with all parties. The integration of the design schedule within the overall project schedule will enable all parties to anticipate each others requirements. Monitor the progress of their work as well as how it relates to the progress of interdependent construction activities. Improved communications allowing a better understanding between parties. As well as an opportunity for a dispute free project.

  6. What benefits does the Builder realize from the implementation of CPM? Builder The Builder realizes substantial gains from the utilization of a CPM scheduling program. Used early, it allows the builder to more accurately calculate the most realistic end date of the project. 1 2 Objective, fact based, analysis of their projects. The tools and information required to become a leader in their marketplace. 3 4 Improved communication fostering relationships based on understanding, trust, and mutual goals. providing their clients with the most cost effective, timely projects possible. 5 6 The ability to develop a dispute free atmosphere. The ability to make more effective decisions in order to maximize productivity and profitability. 7 8 The tools needed to provide "what if" scheduling scenarios. Manpower & Equipment determinations.

  7. Why Should you use a Consultant ??? Consultant Consultants perform CPM on a full time basis, and are experts in the field. 1 2 Experienced in both construction methods and technical aspects of CPM It is both uneconomical and time-consuming for new users to follow a trial-and-error path. Will provide the customer with "experience on demand" at a fraction of the cost of a full time staff. 3 4 Bring an objective viewpoint to the project team. 5 6 Provide credibility and will focus on your goals. Maximize the value of the tools available. 7 8 While at the same time minimize costs. Provide a successful outcome to your projects!