Main modifications during the coming Christmas TS and implications for start-up Etienne CARLIER TE/ABT/EC 09/12/2011
Outline • Injection • Beam dump • MKQA • TCDQ
Injection • Shot-by-shot logging • Move from measurement and logging databases to SDDS • Add Ip and DUMP switches signals • Check possibility to implement mountain range representation within IPOC viewer • Re-organise signal distribution (same sampling rate for TMR and MAIN switch signals) • Deploy IPOC for triggering signals • MAIN & DUMP triggers, RCPS triggers, Injection Prepulse • Erratic trigger, No trigger, AGK window
Injection (cont.) • Add cooling unit under thyratron heater crates • Replace Pulse Inverter (PI) with Fast Pulse Adapter (FPA) modules Fine synchronization to be re-checked • Reduce AGK window by 50ns (Reduction IQC thresholds for bunches 1) Fine synchronization to be re-checked • Replace LECROY scopes with TEKTRONIX • Embedded web server instead of Windows-XP
Injection (cont.) • Add “userPermitted” and “allUserPermitted” settings in MCS • Add “sparkTimer” status in “isSoftStartPermitted” flag • Review OFF status generation in state machine • Integration PMdata within FESA classes for all data needed by IQC • Numbering timing modules in UA as in drawings
Injection (cont.) • Test magnet PT100s • Maintenance KITS software To be tested before first KISS • Replacement primary circuit breaker in PDC • Check interlock thresholds (MOVD, KFMD…) To be tested before first KISS
Beam Dump • Maintenance HEINZINGER PNCcap35000-10pos power supplies • Replacement HV voltage output transformer • Replacement METALUX resistor in HV output voltage divider Full MKD/MKB recalibration needed • Increase re-trigger delay from 100us to 200us • Upgrade TSU • Firmware • AGK window length • 1.2V internal voltage filtering Revalidation with beam needed (machine setup)
Beam Dump • Replace output circuit (faster) for TSU BIS input circuit (BOOT module) Channel to be re-tested with MP before machine closure • Implement redundant triggering signal for generator IPOC • Repair faulty ROGOWSKI amplifier • Install local control panels in MKB area
Beam Dump • Integration PMdata within FESA classes for all data needed by XPOC Re-commissioning of XPOC system • Improve filtering on MKB signals (wavelets???) • Implement new Energy Scan function • In PLC • In FESA (TBC) • Resynchronize generator level CPU with UTC
Beam dump • Implement • BRF enable/disable property • MKB ready/not_ready property • RBAC roles for these to property Functionality and protection to be tested
MKQA • Upgrade triggering system for Aperture mode Life test before machine closure • Recalibration of Aperture mode voltage dividers • Review OFF status generation in state machine
TCDQ • Replacement 12 bit ADC with 16 bit ADC • Implement beta* interlocking function Full re-validation without beam • Modify measurement to logging database data transfer criteria • Recalibration beam 2 ??? Alignment to be re-checked with beam