40 likes | 50 Views
Update: 1-4-2005. Stony Brook Crew. Clean Room Progress. Laminar Flow Hood: In Place, Operating, New Filters arrived. Ready. Evaporator System: Evap Box Machining nearly complete. Railroad(s): “ToDo” next week. Want “Fake GEMs” Are there 4 spare frames at WIS?
E N D
Update: 1-4-2005 Stony Brook Crew
Clean Room Progress. • Laminar Flow Hood: • In Place, Operating, New Filters arrived. • Ready. • Evaporator System: • Evap Box Machining nearly complete. • Railroad(s): “ToDo” next week. • Want “Fake GEMs” • Are there 4 spare frames at WIS? • Could put simple (no holes) Cu-Ni-Au kapton in place. • Desired for Dry runs.
Vessels Status • Vacuum Storage: • End Flanges Done. • Need simple (Uni-strut) frame to hold in position. • Need to Assemble. • Gain Test Box: • Pump Identified (steal from Evap System). • Retooling needed for Scintillation Tests. • R. Lefferts, A. Sickles, A. Milov. • Old Glove Box: • Are we preparing Prototype for Run6????? • Gloves non-standard (need to “cut” std gloves). • Leaks profusely through bolt threads.
Main Glove Box • Bids have not yet arrived. • New Bid process specifies two bids: • Short one (MBraun will bid ~$53k) • Long one (MBraun will bid ~$63k). • Time an issue…