920 likes | 1.19k Views
Winter Storm 2004. 24” Snowfall 20 Days of Freezing Rain. Vehicles Sliding off Road State Highway 26 First Impact of Storm. Pickup Truck Off Side of Road BIA Route 33. Weather During Storm. Simnasho Fire Hall After Storm. Note Height of Piles of Snow Removed. Simnasho Longhouse.
E N D
Vehicles Sliding off Road State Highway 26 First Impact of Storm
Simnasho Fire Hall After Storm Note Height of Piles of Snow Removed
Simnasho Longhouse Picture taken Jan 16, 2004
Snowpile at Kahneeta Casino Parking Lot Picture taken Jan 16, 2004 Note Height of Snow Pile
Entrance to Golf Pro Shop Picture taken Jan 20, 2004
Sander and Plow Carries 7 CuYd. Sanding Material Cleans 60-100 miles of road per shift Removes loose snow and sands hazardous areas
Sanding Boxes in Shed Rear View of Dump Truck Plows
Front of Snowplow Note Rubber Cutting Edge
Wheels to Keep Plow Above Roadway Located between Snowplow and Cab of Truck Two Wheels (One on left and right side of plow)
BIA Route 7 Snowplow Removal Over 2” Packed Snow and Ice (16+ days freezing weather)
Junction Route 4 + 53Hollywood and Tenino Cinders in Melting Berms
BIA Route 16 Paiute StreetCinders in Melting Berms on Side of Roadway
Road Grader Leaving Shop to Clear Roadways Note: Chain all 6 Wheels
Carbide Tipped Cutting Edge Used to Shave Packed Snow and Ice From Roadways
Grader Removing Packed Snow and Ice From Junction Routes 4 + 75
Berm of Shaved Ice On BIA Route 4
Road Grader Removing Ice From Junction Routes 4 + 53 Note Broken Stop Sign in Stop Bar
Road Grader Shaving Ice Cleans 5-10 miles of road surface per shift Uses Carbide Tipped Cutting Edge
BIA Route 7 After Ice Shaving Note Clean Berms (No Aggregate Loss)