1 / 5

Correction Z-shift

Correction Z-shift. Run 14152025 : 26k events Run 14152027 : 24k events The shift is introduced in pxlOnHalf table for the 2 halves : +3mm Next plots are dV ( v – vP ) vs. sensor for Sector 4 ladder 4 (run 14152025) for Sector 7 ladder 2 (run 14152025). dV vs. sensor , no correction.

Download Presentation

Correction Z-shift

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Correction Z-shift • Run 14152025 : 26k events • Run 14152027 : 24k events • The shift is introduced in pxlOnHalf table for the 2 halves : +3mm • Next plots are dV (v – vP) vs. sensor • for Sector 4 ladder 4 (run 14152025) • for Sector 7 ladder 2 (run 14152025)

  2. dV vs. sensor , no correction

  3. dV distribution, no correction

  4. dV vs. sensor , after correction

  5. dV distribution, after correction

More Related