An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C. Barbieri Schedule 2008 Bled, March 28 2008

  2. Main Events 2008 - 1 • 2008, March 28, submission of NTT proposal Urgent, see comments by D’Odorico Action for Claudia: send to Paradis all dates of observations of Crab • 2008, Apr. 4- 6 Aqueye at the 182 cm (new Moon the 6th) Observing Schedule: Pulsar Crab, no filter, main purposes check clock, check acquisition software, 2 h Orion Nebula, main purpose HBTII, narrow band filters, 1 h A bright (6th) single star (no filter), main purpose check acquistion software, check guiding and seeing, 0.5 h A bright (1th) star (betelgeuse), narrow band filters, main purpose check HBTI, a planet?? check seeing, 0.5 h Quasar 3C273, 13th mag) main purpose check variability, check g(2), 1h 1 variable star with know long period (say 100-200 second) plus high frequency flickering, 3 h Total: 2+1+0.5+0.5+1+3 = 8 h, not necessarily all same night

  3. Main events 2008 - 2 • Apr. 5: start of IQuEye design • Apr. 12: submission of 182cm proposal, not for TNG, wait for next application time (summer time) • April 14: start of joint discussion UPd Ljubljana, main topics: timing, continous vs trigger mode (Occhipinti, Facchinetti, Capraro, Zoccarato) (Paradiz, Ponikvar, Lautar) (Centro) • April 21, delivery of SPADs • May 9: Decision on best acquistion mode • May 9: Decision on final precision we can promise for Harrison (500 ns, based of the width of pulses and expected numbers of photon per pulse) • Jun. 5-6: Harrison Meeting (Nottingham, final document on design of instrument) • June 16-17: end of IQuEye design, critical review, start of construction, intervention of Lujbljana in the decision. • Jun. 23- Jul 3: SPIE + OSIRIS Marseille • July 18: final decisions on UPd and Ljubljana systems for October runs. • Sept. 19: Dedication of MAGIC II(important for political reasons)

  4. Main events 2008 - 3 • Oct. 9-12 Aqueye at 182 (Harrison) (first quarter the 7th)* Revise the observing schedule, but Crab Pulsar has highest priority • Oct. 14-15 tbc Harrison Workshop (full Moon the 14th)** • Oct. 23-28 Aqueye at 182 (Harrison) (last quarter the 21st)* • Oct. 30-31, Harrison Meeting Rome • November, end of IQuEye construction, assembly, testing • Dec. 5, Harrison closing meeting Torino • Dec. 19 end of IQuEye tests, readiness *Preliminary agreement with OAPd, dates to be confirmed ** is it necessary? To be discussed

  5. Main Events - 2009 • Request for new funds? • End of January – February observations at NTT • Preparation of requests for observing time (NTT, VLT, Keck) • Oct. 12-16 Second ESA conference on the scientific utilization of the GALILEO GNSS (Upd)

  6. Critical and Lacking elements List to be revised and completed at end of meeting: • TV camera !! • Polarizing filters • Software for g(2) and HBTII • Delivery time for SPADs • Delivery time for Pyramid