AUTOTRANSFERT principe de fonctionnement et résultats des tests de mise en service

AUTOTRANSFERT principe de fonctionnement et résultats des tests de mise en service. G. KOWALIK EL/TC 1/2/2000. Cahier de Charges. Realimentation en cas de manque réseau 400kV et 130kV Realimentation en cas de défaut cable MP5 et MP7

Download Presentation

AUTOTRANSFERT principe de fonctionnement et résultats des tests de mise en service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUTOTRANSFERT principe de fonctionnement et résultats des tests de mise en service G. KOWALIK EL/TC 1/2/2000

  2. Cahier de Charges • Realimentation en cas de manque réseau 400kV et 130kV • Realimentation en cas de défaut cable MP5 et MP7 • Realimentation en cas des autres défauts électriques • déclenchement intempestif, AU, court-circuit, défaut transfo, etc. • Les PLC devraient communiquer mais être indépendants • assurer le fonctionnement en cas de panne des autres PLC • assurer le fonctionnement en cas de panne de la communication • Défaut sur le jeu de barres devrait bloquer l’autotransfert pour ce jeu de barres • AU ne doit pas bloquer plus que nécessaire

  3. Principe de fonctionnement • Chaque jeu de barres et chaque câble est gère par une séquence (processus) indépendant • La séquence de realimentation démarre avec un manque de tension • La séquence vérifie les sources de realimentation possible selon les priorités données par la configuration • Si la source est disponible la séquence isole le jdb et enclenche la source de secours • Si la source n ’est pas disponible la séquence ne fait rien (sauf informer l ’ opérateur) • Si les conditions de l ’alimentation normale reviennent la séquence de retour démarre • La séquence est bloqué par: • I>> ou Io>> sur les ‘ sources ’ • AU dans la sous-station ou s ’est trouve le PLC • signal du superviseur • non-déclenchement du départ ‘ source ’

  4. SEH9 BE EHT7/E9 70MVA 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  5. Séquence de base Sin 900 800 EMD7/1E • Configuration: définition de la source principale et priorité de secours. Ex. (800, 900, 701) • Possibilité de arrêter chaque séquence séparément • Signal ‘Sin ’- source principale en configuration d ’origine • Vérification de la configuration au démarrage • Possibilité de la re-configuration automatique • La source disponible: • départ embroché • pas de défaut depuis le SEPAM • pas de défaut séquence (enclenchement/declenchement) 701

  6. SEH9 BE EHT7/E9 70MVA Normal Configuration 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  7. SEH9 BE EHT7/E9 70MVA EHT102/1E Trip ! 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  8. SEH9 BE EHT7/E9 70MVA Sequences EMD7/1E and A*9 demarrent 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  9. SEH9 BE EHT7/E9 70MVA Les arrives sont coupees 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  10. SEH9 BE EHT7/E9 70MVA Les sources de secours seront enclenchees 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  11. SEH9 BE EHT7/E9 70MVA Les sources de secours seront enclenchees 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  12. SEH9 BE EHT7/E9 70MVA Les sequences EMD8/1E et MP5 demarrent 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  13. SEH9 BE EHT7/E9 70MVA Coupure des sources et TPN 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  14. SEH9 BE EHT7/E9 70MVA Ordre evoie vers les sources de secours 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  15. SEH9 BE EHT7/E9 70MVA Fin d’autotransfert 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  16. SEH9 BE EHT7/E9 70MVA EHT102/1E en service 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  17. SEH9 BE EHT7/E9 70MVA Ordre a l’alimentation normale 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  18. SEH9 BE EHT7/E9 70MVA TPN on 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  19. SEH9 BE EHT7/E9 70MVA Arrivee transfo ON 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  20. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  21. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  22. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  23. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  24. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  25. SEH9 BE EHT7/E9 70MVA La suite... 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  26. SEH9 BE EHT7/E9 70MVA Fin du retour 30MVA 401 200 BE9 412 EHT102/1E 70MVA MP7 30MVA 901 801 900 800 SEM12 701 802 MP5 60MVA 209 ME9 301, 310, 110, 114 CPL - Couplage 104, 204, 304, 210 CERN CABLES 4 X 15 MVA ME10

  27. Tests de mise en service • Tests de base • manque tension depuis EHT102/1E • manque tension depuis EHT7/E9 • manque tension 400 kV • manque tension 130 kV • défaut câble MP7 • défaut câble MP5 • arrêt d ’urgence SEM12 • Tests de fonctionnement dégradé • démarrage dans une fausse configuration (3 PLC) • test 1er secours non disponible • test secours non disponible • test perte de communication SEM12 - BE9 • problème de déclenchement d ’un départ • problème d ’enclenchement d ’un départ • test ‘3 câbles CERN sur 4 ’ • test ’2 couplages ME9 sur 4 ’

  28. Tests • Déroulement des tests • Samedi matin: amélioration des séquences (temporisations additionnels, changement de reset de flags) • Samedi après-midi: premiers tests a ME9 réussis, rectification erreurs de câblage au BE9 • Dimanche matin: éliminations des aléas dans les séquences, introduction des protections supplémentaires • Dimanche après midi: l ’ensemble des tests refait • Dimanche soir: champagne • Résultats des tests • Sauf le deux derniers tests tous les tests positif • Les deux tests a Jura pas correct sans conséquences majeurs pour l ’autotransfert • L améliorations à prévoir • Remerciements • a tous participants • sous-section d ’exploitation pour préparation et pour realims efficaces

  29. Conclusion • Système flexible et répondant aux exigences de l ’exploitation • Assure l ’alimentation dans (presque) tous les cas • Facilité d ’exploitation • écrans Magelis pour vue d ’ensemble du réseau • MMI intuitif • liste d ’alarmes restreinte et claire • Importance des tests en usine • Améliorations possibles (et nécessaires) • câbles CERN • couplages ME9 • gestion de la puissance • En attente d ’une vraie coupure