70 likes | 92 Views
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG HRRC Closing Report for September 2015] Date Submitted: [ 15 September, 2015 ] Source: [ Junhyeong Kim, Bing Hui ] Company [ ETRI ]
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[IG HRRC Closing Report for September 2015] Date Submitted: [15 September, 2015] Source:[JunhyeongKim, Bing Hui] Company [ETRI] Address [218 Gajeong-ro, Yuseong-gu, Daejeon, 305-700, KOREA] Voice:[+82-42-860-6239], FAX: [+82-42-860-6732], E-Mail:[jhkim41jf@etri.re.kr] Abstract:[IG HRRC closing report for September 2015] Purpose: [IG HRRC closing report for September 2015] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Junhyeong Kim, ETRI
IEEE 802.15 IG HRRC(High Rate Rail Communications Interest Group)Closing Report Bangkok, Thailand Wednesday AM2, September 16, 2015 Junhyeong Kim, ETRI
IG Group Leadership • Chair : Junhyeong Kim (ETRI, South Korea) • Secretary : Bing Hui (ETRI, South Korea) Junhyeong Kim, ETRI
Sessions • 5th meeting for IG HRRC • Joint 15/16 meeting • 1 session • Monday AM2 (10:30 ~ 12:30), September 14, 2015 • 14 participants Junhyeong Kim, ETRI
Meeting Accomplishments • Technical discussions • Millimeter-wave beamforming for high-speed train communication : 15-15-0667-01-hrrc • Mobile channel characterization inside subway tunnels at 30 GHz : 15-15-0666-01-hrrc • Small RMS delay spread • Directional antennas can reduce the distance of the signal suffering Doppler spread • Demonstration video • Plan for November meeting • Further technical discussion on channel modeling of mmWave for railway in various environments Junhyeong Kim, ETRI
Contributions • 5 contributions • Contribution #1 (15-15-0644-02-hrrc) : IG HRRC September 2015 Agenda • Contribution #2 (15-15-0667-01-hrrc) : A Study on mmWave Beamforming for HST Communication • Contribution #3 (15-15-0666-01-hrrc) : Mobile channel characterization in typical subway tunnels at 30 GHz • Contribution #4 (15-15-0688-00-hrrc) : Meeting Minutes of September 2015 • Contribution #5 (15-15-0697-00-hrrc) : Closing Report for September 2015 Junhyeong Kim, ETRI
Thank you Junhyeong Kim, ETRI