An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RENAISSANCE LYONWP Progress and PlansWP 2: Monitoring and Analysis Christophe Ménézo Professor University of Savoy / LOCIE Invited by INSA Lyon-CETHIL Christophe.menezo@univ-savoie.fr

  2. WP 2.1 Electrical Network • Planned Activities: - Platform of measurements of the impact of the PV on the electrical distribution networks (at INSA of Lyon) - Measurements of the impact of PV systems installed in Lyon-Confluence Area on the distribution network

  3. WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Site : Electrical Engineering Dpt • Definition of platform objectives and design • Supplier (Tenesol) Done

  4. WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Project Submission to the National Research Agency (ANR) • Agreement between EDF R&D, INES RDI, Transénergie and INPGrenoble • Contact with INSA School of Electrical Engineering Master student subject Done

  5. WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Definition of the measurements protocol • Installation of the platform : 2 kWc • Installation of Practical Courses for Engineering Students of INSA • j Done Planed For next 18 months

  6. WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Constructive data-gathering of the distribution network on the Lyon-Confluence area • Measurement Protocol definition with EDF R&D and INSA • Waiting for construction of the buildings and PhotoVoltaic systems : delay in the construction schedule for blocks A, B, C => to see other place for measurements Planed For next 18 months

  7. WP 2.2 Experience Feedback - Monitoring • Planned Activities: Multiscale Monitoring • Global Monitoring • Detailed Monitoring • Localised Monitoring ENERTECH

  8. WP 2.2 Experience Feedback - Monitoring • Global Monitoring (promoters and dealers) - Counting and sub-counting heating room and sub-station and Solar Domestic Hot Water - Counting and under counting electricity in building • Detailed Monitoring (Enertech) -By housing - Followed Consumption: Cooking, lighting, washing machine - Followed thermal evolution • Localised Monitoring (INSA-CETHIL) -Some residences which have been numerically modeled First contact with Inhabitants (Hespul, Promoters; INSA, Enertech)

  9. WP 2.2 Experience Feedback - Monitoring Detailed Monitoring (Enertech) : expected results (such as in Restart Project) - Thermal Confort Human thermal gain Apartment Electricity Use Domestic Hot Water Domestic Hot Water distribution Common Electricity Use Cooking

  10. WP 2.2 Experience Feedback - Monitoring Tests of sensors accuracy (INSA-CETHIL) Wireless sensors • Identification of sensors (for Air temp. and Humidity) • Use of Infrared camera (inside/outside?) Large range of : Temp. ; sampling time ; autonomy MINIBAT

  11. WP 2.2: Quality Control and Performance Analysis • Analysis of progress • Delays in construction => delays for monitoring • Submission of a new schedule to the EC (in relation with WP 1.5) • Plans for the next 6 months • Training session organized for sales agents • Plans depend on the delays of construction + possibilities to extend the contract • First data aquisition in almost one year (minima)

  12. WP 2.3 European Highlight • Analysis of progress • Strong points : Zaragosa and Lyon not in phase • Experiences of Zaragosa not highlighted enough for Lyon • Networking opportunities should be much more used • (webcam exchange for regular exchange • for specific topics (focus), …)

  13. WP 2.3 European Highlight • Plans for the next 6 months (end of year 3) • - Lyon strategy complete definition and planning of phases • Comparison with Zaragossa • - Common identification of what has to be highlight ? • Identification of strong/weak points on each side? • Definition of a monitoring strategy referential?

  14. ENERTECH Contact Christophe MENEZO Christophe.Menezo@univ-savoie.fr