RENAISSANCE LYON WP Progress and Plans WP 2: Monitoring and Analysis. Christophe Ménézo Professor University of Savoy / LOCIE Invited by INSA Lyon-CETHIL Christophe.menezo@univ-savoie.fr. WP 2.1 Electrical Network. Planned Activities:
E N D
RENAISSANCE LYONWP Progress and PlansWP 2: Monitoring and Analysis Christophe Ménézo Professor University of Savoy / LOCIE Invited by INSA Lyon-CETHIL Christophe.menezo@univ-savoie.fr
WP 2.1 Electrical Network • Planned Activities: - Platform of measurements of the impact of the PV on the electrical distribution networks (at INSA of Lyon) - Measurements of the impact of PV systems installed in Lyon-Confluence Area on the distribution network
WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Site : Electrical Engineering Dpt • Definition of platform objectives and design • Supplier (Tenesol) Done
WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Project Submission to the National Research Agency (ANR) • Agreement between EDF R&D, INES RDI, Transénergie and INPGrenoble • Contact with INSA School of Electrical Engineering Master student subject Done
WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Definition of the measurements protocol • Installation of the platform : 2 kWc • Installation of Practical Courses for Engineering Students of INSA • j Done Planed For next 18 months
WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Constructive data-gathering of the distribution network on the Lyon-Confluence area • Measurement Protocol definition with EDF R&D and INSA • Waiting for construction of the buildings and PhotoVoltaic systems : delay in the construction schedule for blocks A, B, C => to see other place for measurements Planed For next 18 months
WP 2.2 Experience Feedback - Monitoring • Planned Activities: Multiscale Monitoring • Global Monitoring • Detailed Monitoring • Localised Monitoring ENERTECH
WP 2.2 Experience Feedback - Monitoring • Global Monitoring (promoters and dealers) - Counting and sub-counting heating room and sub-station and Solar Domestic Hot Water - Counting and under counting electricity in building • Detailed Monitoring (Enertech) -By housing - Followed Consumption: Cooking, lighting, washing machine - Followed thermal evolution • Localised Monitoring (INSA-CETHIL) -Some residences which have been numerically modeled First contact with Inhabitants (Hespul, Promoters; INSA, Enertech)
WP 2.2 Experience Feedback - Monitoring Detailed Monitoring (Enertech) : expected results (such as in Restart Project) - Thermal Confort Human thermal gain Apartment Electricity Use Domestic Hot Water Domestic Hot Water distribution Common Electricity Use Cooking
WP 2.2 Experience Feedback - Monitoring Tests of sensors accuracy (INSA-CETHIL) Wireless sensors • Identification of sensors (for Air temp. and Humidity) • Use of Infrared camera (inside/outside?) Large range of : Temp. ; sampling time ; autonomy MINIBAT
WP 2.2: Quality Control and Performance Analysis • Analysis of progress • Delays in construction => delays for monitoring • Submission of a new schedule to the EC (in relation with WP 1.5) • Plans for the next 6 months • Training session organized for sales agents • Plans depend on the delays of construction + possibilities to extend the contract • First data aquisition in almost one year (minima)
WP 2.3 European Highlight • Analysis of progress • Strong points : Zaragosa and Lyon not in phase • Experiences of Zaragosa not highlighted enough for Lyon • Networking opportunities should be much more used • (webcam exchange for regular exchange • for specific topics (focus), …)
WP 2.3 European Highlight • Plans for the next 6 months (end of year 3) • - Lyon strategy complete definition and planning of phases • Comparison with Zaragossa • - Common identification of what has to be highlight ? • Identification of strong/weak points on each side? • Definition of a monitoring strategy referential?
ENERTECH Contact Christophe MENEZO Christophe.Menezo@univ-savoie.fr