110 likes | 231 Views
Transmission Design. EWITS Great Lakes Nov 2, 2009. Original Expansion of Conventional Generation. Wind generation by scenario assumed to have 20% capacity value EGEAS expansion performed to identify regional generation needed for reliability
E N D
Transmission Design EWITS Great Lakes Nov 2, 2009
Original Expansion of Conventional Generation Wind generation by scenario assumed to have 20% capacity value EGEAS expansion performed to identify regional generation needed for reliability Following LOLE/ELCC analysis, some of this generation could be deferred EWITS Technical Review Committee Webinar October 2, 2009
Overlays for 4 Scenarios Scenario 2 Scenario 1 Scenario 4 Scenario 3 EIWTS Technical Review Committee Webinar October 2, 2009
Price and Quantity of Sources and Sinks Determine Transmission Requirements
Overlays for 4 Scenarios Scenario 2 Scenario 1 Scenario 4 Scenario 3 EIWTS Technical Review Committee Webinar October 2, 2009
Year to Year ELCC Variability • Year to Year variation in the ELCC results is due to • The different Hourly Load & Wind Profiles (2004, 2005 & 2006) • And where the wind is located in each of the different Scenarios • As can be seen in the results a shift • As more wind was located in the East (Scenario 3 & 4)The 2006 profile contained the higher ELCC • As more wind was located in the West (Scenario 1)The 2004 profile contained the higher ELCC