The integrated Double Bull Cement plant at Risda, Baloda Bazaar is situated 70 km away from Raipur, the capital of Chhattisgarh
E N D
Risda Plant Chattisgarh Double bull cement
The integrated unit at Risda in Chhattisgarh was commissioned in 2016, with an initial cement production capacity of 2.5 MMTPA. As of December 31, 2020, the Risda Cement Plant had an aggregate cement and clinker production capacity of 3.0 MMTPA and 3.2 MMTPA, respectively. We source limestone for the Risda Cement Plant from a mine of 222.13 MT limestone reserve located in the Risda mines.
The Risda mines are located adjacent to the Risda Cement Plant, where we operate a fully mechanized, open-cast mine, and are able to extract sufficient quantities of limestone for our current clinker production requirements. At this facility, we have a 30 MW captive coal-based power plant and a 15 MW waste heat recovery system. We source almost all of our electrical energy requirements for the Risda Cement Plant from the captive power plant and waste heat recovery system. We are also connected to the state electricity grid.
CONTACT US Double Bull Cement believes in excellence. Its manufacturing and grinding units are slowly and steadily spreading across India and our growth story is a story of all our retailers, dealers and partners. We are here to help you. Help us is helping you better. Do feel free to reach out to us in case of product, service, and marketing related queries. Cement plant address ( Chhattisgarh ) : Suhela Road, Risda, Dist – Baloda Bazar – 493332 (CG)Single Point of Contact – Mr. Raju Banerjee