1 / 8

IG HRRC Closing Report for March 2016: ETRI Contributions

This document presents the closing report of the IEEE P802.15 IG HRRC for March 2016, detailing technical discussions, performance evaluations, future plans, and contributions by ETRI.

sullivanj
Download Presentation

IG HRRC Closing Report for March 2016: ETRI Contributions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[IG HRRC Closing Report for March 2016] Date Submitted: [15March, 2016] Source:[Junhyeong Kim] Company [ETRI] Address [218 Gajeong-ro, Yuseong-gu, Daejeon, 34129, KOREA] Voice:[+82-42-860-6239], FAX: [+82-42-861-1966], E-Mail:[jhkim41jf@etri.re.kr] Abstract:[IG HRRC closing report for March 2016] Purpose: [IG HRRC closing report for March 2016] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Junhyeong Kim, ETRI

  2. IEEE 802.15 IG HRRC(High Rate Rail Communications Interest Group)Closing Report Macau, China Wednesday AM2, March 16, 2016 Junhyeong Kim, ETRI

  3. IG Group Leadership • Chair : Junhyeong Kim (ETRI, South Korea) • Secretary : Danping He (Beijing Jiaotong University, China) Junhyeong Kim, ETRI

  4. Sessions • 7th meeting for IG HRRC • Joint 15/16 meeting • 1 session • Tuesday AM2 (10:30 ~ 12:30), March 15, 2016 • 8 participants Junhyeong Kim, ETRI

  5. Meeting Accomplishments • Technical discussion • Performance Evaluation of Millimeter-wave-based Communication System in Subway Tunnels (15-16-0185-01-hrrc) • Performance evaluation of testbeds of the rail communication system developed by ETRI in Seoul subway tunnel (subway line 8) • Coverage test to determine an appropriate RU spacing in the tunnel for demonstration • Deployment of the testbed in the Seoul subway line 8 • Field trial of the system in moving subway train • Demonstration video • Discussion on other issues • Recent 3GPP’s standardization issues relevant to IG HRRC Junhyeong Kim, ETRI

  6. Future Plans • Updated Call for Interest (CFI) document will be posted before July meeting in San Diego • Discussion on the possibility of transition to study group Junhyeong Kim, ETRI

  7. Contributions • 4 contributions • Contribution #1 (15-16-0181-02-hrrc) : IG HRRC March 2016 Agenda • Contribution #2 (15-16-0185-01-hrrc) : Performance Evaluation of Millimeter-wave-based Communication System in Subway Tunnels • Contribution #3 (15-16-0266-00-hrrc) : Meeting Minutes of March 2016 • Contribution #4 (15-16-0260-00-hrrc) : Closing Report for March 2016 Junhyeong Kim, ETRI

  8. Thank you Junhyeong Kim, ETRI

More Related