1 / 17

Conventional Facilities for MMF: Facility Design Criteria, Space Requirements, and Building Criteria

This presentation outlines the design criteria, space requirements, and building criteria for a conventional facility dedicated to Undulator magnet tuning, magnet measuring, fiducialization, and storage. The presentation covers aspects such as site location, environmental stability specifications, utility requirements, and resultant building criteria.

sullivann
Download Presentation

Conventional Facilities for MMF: Facility Design Criteria, Space Requirements, and Building Criteria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conventional Facilities – MMF Presentation Outline • Facility Design Criteria • Site Location • Facility Design • Schedule

  2. Facility Design Criteria • Facility Use • Space Requirements • Environmental Stability • Temperature +/- 0.1 deg. C. • Humidity • Vibration <0.5 microns • Utility Requirements • Electrical • Other

  3. MMF Facility Uses • Undulator magnet tuning – 2 magnet measuring machine test stands • Aligned with same orientation to Earth’s magnetic field as LCLS Undulator Hall. • Undulator fiducialization – large coordinate measuring machine • Cradle assembly area • Magnet storage/temperature acclimation • Work desks in lab and office space for 2 employees

  4. Resultant Building Criteria • ~4800 sq. ft. floor space (inc. ~3000 laboratory space) + mezzanine • Locate within an existing building to aid in temperature control • Adequate ceiling height for overhead cranes • Accessible for magnet delivery using trucks and forklifts • Availability of required utilities, esp. electrical service – 600A, 480v 3f

  5. Building 081 Location LCLS Undulator Hall Research Yard PEP Ring Road

  6. Building 081 Site Layout

  7. Building 081 Current Uses

  8. New Space Allocation for Bldg. 081 Offices SHIPPING & RECEIVING VEHICLE SHOP EQUIPMENT REPAIR

  9. MMF Ground Floor Plan

  10. MMF Ground Floor Plan Magnet Measuring Lab ~1600 ft. sq.

  11. MMF Ground Floor Plan Coordinate Measuring Area ~ 1000 ft. sq.

  12. MMF Ground Floor Plan Cradle Assembly Area ~325 ft. sq.

  13. MMF Ground Floor Plan Magnet Loading and Storage ~850 ft. sq.

  14. Mezzanine Floor Plan Mezzanine for Mechanical Equipment

  15. Cross Sections

  16. Rear Elevation Mechanical Access Staff Access Roll up door for magnet delivery

  17. Schedule • Completion of Title II drawings • December 2004 • Bid and contract with general contractor • January – April 2005 • Construction • May – November 2005 (Early Finish) • February 2006 (Beneficial Occupancy)

More Related