1 / 12

WELCOME HARLAN TO HAZARD STUDY PUBLIC WORKSHOP #2

WELCOME HARLAN TO HAZARD STUDY PUBLIC WORKSHOP #2. Project Status: Steps Completed P – Public Meetings Held in August P – Project Goals and Planning Considerations Finalized P – Environmental Footprint Completed P – Thirteen (13) Preliminary Corridors Identified and Studied

sumana
Download Presentation

WELCOME HARLAN TO HAZARD STUDY PUBLIC WORKSHOP #2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME HARLAN TO HAZARD STUDY PUBLIC WORKSHOP #2

  2. Project Status: Steps Completed P – Public Meetings Held in August P – Project Goals and Planning Considerations Finalized P – Environmental Footprint Completed P – Thirteen (13) Preliminary Corridors Identified and Studied P– Information and Alignments Presented to KYTC

  3. Project Status: Objectives of Tonight’s Meeting: Obtain Comments on Alternatives Obtain Opinion on Which Alternatives to Eliminate/Advance

  4. Project Status: Next Steps Identify Short-List of Alternatives Evaluate Alternatives in More Detail Make Final Recommendations Develop Draft Planning Report Publish Final Planning Report

  5. Evaluation Process: Measures of Effectiveness Alternatives Initial Review All Possibilities August ‘03 Screening Analysis Level 1 Conceptual December ‘03 Level 2 Refined Detailed Analyses

  6. August 2003 Public Workshops

  7. Public Workshops – Comments: Top Priorities: Improve Safety of Roadways Serve Highest Volumes of Traffic Minimize Relocations of Homes and Businesses Enhance Economic and Tourism Development Implement Reconstruction Quickly

  8. Project Goals: Provides a Roadway Network that Meets Current Safety Design Standards Improves Travel Time Between Harlan and Hazard Accommodates Traffic Demands Accommodates Large Truck and School Bus Traffic Accommodates Regional Tourist Traffic 

  9. Planning Considerations: Constructability Cost Impacts to Human and Natural Environment Serves Communities Within Study Area In Concert With Public and Agency Input

  10. Mail Kentucky Transportation Cabinet Division of Planning 125 Holmes Street Frankfort, KY 40622 Phone (502) 564-7183 Fax (502) 564-2865 Email bruce.siria@ky.gov How To Contact Us:

  11. Overview of the 13 Alternative Corridors

  12. Thirteen Build Alternatives: Alignments Identified by Citizens and Agencies Mainline 2 Use US 421 3 Near but East of US 421 6 Cross County Between US 421 and KY 15 2 Use US 119 to Cumberland and KY 463 North Northern Terminus 4 End at KY 118 in Hyden 5 End at Hal Rogers Parkway 1 End at Hazard 3 End South of Hazard at Viper

More Related