1 / 2

Geometry

Geometry. TOF R=212cm. BEMC: 40*120 (eta*phi) towers 1 Tower: 0.05*0.05 (eta*phi) 12cm*12cm. BEMC R=225cm. Δη =0.1. TOF: 2*60 (eta*phi) trays 1 tray=32 MRPC modules 1 module=6 cells 1 cell: 6cm*3cm. ΔΦ =0.1. Some issues

summer
Download Presentation

Geometry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geometry TOF R=212cm BEMC: 40*120 (eta*phi) towers 1 Tower: 0.05*0.05 (eta*phi) 12cm*12cm BEMC R=225cm Δη=0.1 TOF: 2*60 (eta*phi) trays 1 tray=32 MRPC modules 1 module=6 cells 1 cell: 6cm*3cm ΔΦ=0.1

  2. Some issues • TOF efficiency & acceptance ( (0.85*0.95*0.9)2=0.5 !! ) • Gaps between TOF trays (lose 10%-20% acceptance) • TOF efficiency for pT~5 GeV/c e is >90% • TOF May have dead/hot area during the Run • Mismatch between tower & cells • Cross-talk within 1 MRPC module • Large vertex Z • Preliminary results indicate the rejection factor is ~6 for L2 upsilon trigger in Run9 p+p 200 GeV • Need full simulations in Au+Au 200 GeV • L0+L2 frame work coding and baby sitting during the Run • BEMC • BEMC pre-calibration • Hot tower dynamic masking • TOF • Decoding • Hot cell/module dynamic masking • Online documentation and display • Need input from the TOF experts (firmware)

More Related