Production Planning – Designing Tooling. How can tooling effect the production process?. Production Planning - Tooling. There are 2 parts to production planning: Facility design or planning Tooling design In this unit we will be focusing on tooling design.
E N D
Production Planning – Designing Tooling How can tooling effect the production process?
Production Planning - Tooling • There are 2 parts to production planning: • Facility design or planning • Tooling design • In this unit we will be focusing on tooling design. • How can tooling design affect the production of a product?
Before we begin… Review your class project from the design unit. Create the following chart in your design notebook: Part of Product– list each part of your game Material – what materials is each part made from Tool Needed – what tool will you use to create that part Tooling Needed – we will be learning about this
Definition of Tooling • Machine operators are able to make parts better and faster with less tooling changes if tooling is designed correctly. • Tooling increases: • Accuracy • Speed • Safety
Jigs – attach to the part being processed and guide the part • Example – a box a product goes into to help hold it together for nailing • Fixtures – attach to a machine to help position the part being processed. • Example – a stop block on a saw to help determine the length the wood needs to be cut
Brainstorm with a Partner Write down 2 ways jigs and fixtures can help with each of the following: Speed Accuracy Safety
Speed of Manufacturing • Increases when operations run smoothly • Tooling increases speed of operation because operators do not have to position materials
Accuracy of Manufacturing • Tooling increases accuracy • Time is not wasted having to position materials • Examples – • A stop block on a saw to measure the length material is to be cut • A fixture to determine where a hole should be drilled
Safety in Manufacturing • Tooling holds the part allowing the operator’s hands to be out of the way • Example – A part can be placed in a fixture that is clamped to the drill press. It can help hold it down while the part is being drilled, reducing the chance of the part spinning or hands being to close to the drill bit.
Class Activity With a partner, go back to the chart you created at the beginning of this unit. Think through each part and determine if there is a jig or fixture that could be built to help with the production process. Think about how you will complete the assembly. Complete sketches and any jigs or fixtures that need to be built with measurements. You need a multi-view drawing and an isometric drawing. Prepare a brief presentation you can give to the class on your ideas.
Presentation Create the following chart to write notes in about each of the groups presentations:
Production Planning - Tooling Now that you have learned about tooling - write a brief answer to the following question in your notebook: How can tooling design affect the production of a product?