1. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 1 IAEA – Technical Working Group on Nuclear Power PlantsControl and Instrumentation Vienna, AUSTRIA
23 to 25 May 2005
Mario Oscar Sabransky
I&C and Electrical Maintenance Atucha 1 NPP
Nucleoeléctrica Argentina Sociedad Anónima
2. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 2 Status of the Instrumentation & Control in the Argentine Nuclear Power Plants INTRODUCTION
1974 – Atucha 1 NPP (CNA1) began commercial operation.
1984 – Embalse NPP (CNE) began commercial operation.
1980 – Atucha 2 NPP (CNA2) started construction.
1994 – NA-SA become operator of the in service NPPs and responsible for the management of human resources, equipments and installations of the temporarily stopped CNA2.
3. IAEA - TWG NPPCI meeting NA-SA Nucleoeléctrica Argentina Sociedad Anónima 3 Status of the Instrumentation & Control in the Argentine Nuclear Power Plants