1 / 16

Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish”

Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish”. Building Redevelopment Project. Building Redevelopment Project. a light shining out, drawing people in. Since March….. - considered and reviewed over 80 design issues with ReFormat, Caldera and other specialists

Download Presentation

Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish” Building Redevelopment Project

  2. Building Redevelopment Project a light shining out, drawing people in

  3. Since March….. - considered and reviewed over 80 design issues with ReFormat, Caldera and other specialists - Looked at opportunities to reduce costs and simplify design - Looked at the detailed design requirements for the auditorium

  4. Lighting Sound systems and acoustics

  5. Two more Phases of Work 4A – ground floor kitchen, toilets, lantern 4B – auditorium, front extension, external

  6. Proposed scope of work for next phase (Phase 4A) • Part of Auditorium; • Lantern roof • Lantern windows • Side windows • Window and blind controls • Lighting in lantern • External cladding to • auditorium • Auditorium stays in use • for services • Ground Floor; • Kitchen and food store • Two store areas • Gents and Ladies toilet • Disabled toilet & wet room • Dining space: lighting • ceiling, acoustic partition • Underfloor heating • Drainage • Rainwater harvesting

  7. Phase 4A ACOUSTIC PARTITION GLASS PARTITION LADIES TOILET DRAINAGE & UNDERFLOOR HEATING DISABLED TOILET GENTS TOILET DECORATION STORE CEILING AND LIGHTING STORE NEW DOOR KITCHEN

  8. Phase 4A Store areas Male, Female, disabled toilets Kitchen Servery Dining Dining space – toilets - kitchen - stores

  9. Kitchen Layout -extends into snug area - includes servery

  10. Phase 4A - Auditorium • Lantern roof • Lantern windows • Side windows • Window and blind controls • Lighting in lantern • External cladding to auditorium • Gutters & rainwater tank • Auditorium stays in use for services

  11. Phase 4B Lighting, AV/IT Seating Parent & toddler room (balcony) New entrance Media studio (balcony area) Flat area with flexible staging Ventilation with some cooling Auditorium

  12. Phase 4B Servery Lounge area Reception Terrace Ramp Servery – lounge - extension – external areas

  13. Auditorium design concept images More information on phase 4B and auditorium at future meeting

  14. Cost for 4A Will be;- £1,000,000 (as approved at church meeting) - This assumes a start in 2018

  15. What next; • Gift day 15 October • Complete update of drawings and specification documents • When most of funding in place get tender from Caldera and check costs • Phase 4B – as soon as possible after phase 4A.