Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish”. Building Redevelopment Project. Building Redevelopment Project. a light shining out, drawing people in. Since March….. - considered and reviewed over 80 design issues with ReFormat, Caldera and other specialists
E N D
Guildford Baptist Church Phase 4 – Sept 2017 “kicking on to the finish” Building Redevelopment Project
Building Redevelopment Project a light shining out, drawing people in
Since March….. - considered and reviewed over 80 design issues with ReFormat, Caldera and other specialists - Looked at opportunities to reduce costs and simplify design - Looked at the detailed design requirements for the auditorium
Lighting Sound systems and acoustics
Two more Phases of Work 4A – ground floor kitchen, toilets, lantern 4B – auditorium, front extension, external
Proposed scope of work for next phase (Phase 4A) • Part of Auditorium; • Lantern roof • Lantern windows • Side windows • Window and blind controls • Lighting in lantern • External cladding to • auditorium • Auditorium stays in use • for services • Ground Floor; • Kitchen and food store • Two store areas • Gents and Ladies toilet • Disabled toilet & wet room • Dining space: lighting • ceiling, acoustic partition • Underfloor heating • Drainage • Rainwater harvesting
Phase 4A ACOUSTIC PARTITION GLASS PARTITION LADIES TOILET DRAINAGE & UNDERFLOOR HEATING DISABLED TOILET GENTS TOILET DECORATION STORE CEILING AND LIGHTING STORE NEW DOOR KITCHEN
Phase 4A Store areas Male, Female, disabled toilets Kitchen Servery Dining Dining space – toilets - kitchen - stores
Kitchen Layout -extends into snug area - includes servery
Phase 4A - Auditorium • Lantern roof • Lantern windows • Side windows • Window and blind controls • Lighting in lantern • External cladding to auditorium • Gutters & rainwater tank • Auditorium stays in use for services
Phase 4B Lighting, AV/IT Seating Parent & toddler room (balcony) New entrance Media studio (balcony area) Flat area with flexible staging Ventilation with some cooling Auditorium
Phase 4B Servery Lounge area Reception Terrace Ramp Servery – lounge - extension – external areas
Auditorium design concept images More information on phase 4B and auditorium at future meeting
Cost for 4A Will be;- £1,000,000 (as approved at church meeting) - This assumes a start in 2018
What next; • Gift day 15 October • Complete update of drawings and specification documents • When most of funding in place get tender from Caldera and check costs • Phase 4B – as soon as possible after phase 4A.
Building Redevelopment Project “kicking on to the finish”