Interchange Distribution Calculator Working Group (IDCWG) Update

Interchange Distribution Calculator Working Group (IDCWG) Update. NAESB BPS Yasser Bahbaz – IDCWG Chair April 4 th , 2012. IDCWG Update. Meetings/Conference Calls IDC Change Order Updates GTL Update. Meetings/Conf Calls. March 21 – 22 nd Charlotte, NC (DUKE)

suzano
Download Presentation

Interchange Distribution Calculator Working Group (IDCWG) Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interchange Distribution Calculator Working Group(IDCWG)Update NAESB BPS Yasser Bahbaz – IDCWG Chair April 4th, 2012

  2. IDCWG Update • Meetings/Conference Calls • IDC Change Order Updates • GTL Update

  3. Meetings/Conf Calls • March 21 – 22nd Charlotte, NC (DUKE) • March, CO 283/GTL Workshop– Not a formal IDCWG meeting – Calculation Testing • May 16 – 17th Atlanta GA (NERC) - BPS Joint Meeting

  4. Implemented • CO 317: Michigan PAR Status Change Switch. • Implementation is on April 4th. • CO 331: IDC Interface to NAESB Web Registry

  5. Development/Testing • CO 322: PFV Generation Priority Submissions * • Will be moved to development once a final methodology is reached at BPS. Will be revised as needed. • CO 330: Authorization of OATI Use of IDC Data for DOE Studies • CO 332: Changes to Manitoba EAR Tag in IDC • CO 333: Include MF and NNL on TLR Event History Display • CO 336: Changes to IDC Factor Calculation Timing * • This will be moved for development after the PARs are in service and an evaluation on the behavior of status changes is completed by IESO and MISO

  6. Development/Testing • CO 338: Default Timing for TLR Levels 1 and 0 • CO 340: Effective Date on Market Coordinated Flowgates • CO 341: MISO and PJM ED6/7FN Transfer to IDC • Ready for implementation • SDX CO 08: Remaining GUI Changes • Ready for implementation

  7. DRAFT/Evaluation • CO 326: PFV Metrics * • Maybe revised after a final methodology is reached at BPS. • CO 328: Intra Hour Tag Curtailment • Different other proposals are being evaluated and considered by the IDCWG. • CO 346: Curtailment Auto Acknowledgment

  8. IDCWG Update GTL Update

  9. IDCWG Update Change Order 283 Status

  10. IDCWG Update • During the GTL Workshop, OATI went over the calculation methodology of CO 283. • Certain calculation inconsistencies were identified and OATI is working on a fix. • Several GUI enhancements were identified and will be worked on once the final methodology is reached and work is resumed on IDCWG and OATI end on the project.