1 / 38

上海 2010 世博会项目群数字可视化管理

上海 2010 世博会项目群数字可视化管理. 吴志强. IPMA International Young Crew Workshop Shanghai , China , 1 3 th -1 4 th October 2006. 上海 2010 世博会项目群数字可视化管理 Digital v isual portfolio management Expo of 2010 Shanghai China. 吴志强 WU Zhiqiang 同济大学 Tongji University 2006.10.14. 1. 研究背景 Background.

suzuki
Download Presentation

上海 2010 世博会项目群数字可视化管理

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 上海2010世博会项目群数字可视化管理 吴志强

  2. IPMA International Young Crew Workshop Shanghai,China,13th -14th October 2006 上海2010世博会项目群数字可视化管理 Digital visual portfolio management Expo of 2010 Shanghai China 吴志强 WU Zhiqiang 同济大学 Tongji University 2006.10.14

  3. 1.研究背景 Background

  4. 世博会成功的关键 Key issue for a successful Expo • 世博会规划建设是一个复杂巨系统 • 基地位于城市中心区边缘 • 规模史无前例(5.28km2、7000万预测参观人次极有可能被突破) • 建设量大、工程复杂 • 缺乏经验、不确定因素多 • 多系统整合与多方参与者的协同作战 • The planning & construction process of Expo is • A Complicated Mega system • Site Located at the edge of downtown area • Largest scale in expo’ s history (5.28km2, 70millonen estimated visitors) • Include a large amount of complicated projects • Local authority lack of experience for such a mega event • Integration of different sectorsand cooperation between diverse actors

  5. N-S viaduct Inner Ring Lujiazui Yan’an Rd.viaduct EXPO Site selection Downtown waterfront site along the Huangpu River between Nanpu Bridge & Lupu Bridge

  6. Coordinated area 1.4km2 Expo Site 5.28km2 • Expo site: 5.28 km² -- 3.93 km² in Pudong -- 1.35 km² in Puxi

  7. Visitors Estimation: • Total number of visitors: 70 million • -- 400,000 (average day) • -- 600,000 (peak day) • -- 800,000 (extreme peak day) Number of visitors in 1 day exceeds 780,000 (Oct.03) 50 million visitors 10 million visitors

  8. Visitors per day Area per visitor per day 800,000 600,000 351,000 400,000 272,000 14m2 14m2 13m2 118,000 9m2 9m2 8m2(estimated) 82,000 77,000 Montreal Osaka Lisbon Hannover Aichi Shanghai Comparisons with past Expos Largest scale ever since the birth of Expo

  9. 项目成功与否很大程度上取决于决策者、设计者、建设者、项目参与各方对于项目信息及时、直观、深入的了解、沟通、共享,因此需要一套具有中枢功能的规划建设数字可视化系统,能够直观地模拟和指导世博园区的规划建设过程。项目成功与否很大程度上取决于决策者、设计者、建设者、项目参与各方对于项目信息及时、直观、深入的了解、沟通、共享,因此需要一套具有中枢功能的规划建设数字可视化系统,能够直观地模拟和指导世博园区的规划建设过程。 The success of expo planning & construction depends greatly on timely, direct and deep understanding of decision-makers, designers, builders and all project actors on project information. Therefore, it is pressing to build an integrated digital visual managementsystem for timely mutual supervision, simulation, and control on the planning and building lifecycle of Expo site through collecting and distributing visual information, which leads to rational design, demonstration, management and decision-making.

  10. Research Framework

  11. 2.世博园区规划建设过程管理模式 Management modes for planning & building process of Expo site

  12. 工程项目管理模式研究 Project Management modes 1. 项目管理承包模式(Program Management Contracting, PMC) 2. 一体化项目管理模式(Program Management, PM) 3. 建筑工程管理模式(Construction Management.CM) 4. 设计——施工模式(Design Build. DB) 5. 设计-管理模式(Design-Manage) 6.更替型合同模式(Novation Contract, NC)

  13. 世博园区规划建设过程管理中存在的问题 Challenges facing Expo planning & building process • 建设规模大,项目群体化; • 决策、管理、设计、施工投资等参与者多; • 投资多,建设周期长; • 与政治经济社会和城市整体空间之间相互影响大; • 内外部环境不定因素较多,技术经济和社会风险大; • 组织管理复杂,信息量大。 • Large scale, portfolio projects • Large number of participants in decision-making, management, design and building • large investment and long building period • Big impact on politics, economy, society and overall urban space • Unstable factors from outer and inner environment, high technical and social risk • Complicated organization and management, large amount of information

  14. 世博园区规划建设过程管理对策 Proposals for Expo planning & building process management • “PM+CM”开发组织模式 • PRE-POST开发运行模式 • 规划建设全生命周期可视化平台控制管理模式 • “PM+CM” mode • PRE-POSTmode • Digital visual Lifecycle Management of Planning • & building process

  15. “PM+CM” mode

  16. “PM+CM” mode

  17. PRE-POST的过程控制核心思想 Core ofPre-post use PRE-POST 收益 Profit 最成功 成功 平手 时间 Time 前 中 后 pre during post

  18. PRE-POST的过程控制Procedure Control Based on PRE-POST PRE-POST economic operation mode

  19. 传统运行方式的累计收益 Traditional mode accumulated profit PRE-POST运行方式的累计收益 PRE-POST mode accumulated profit PRE-POST的过程控制Procedure Control Based on PRE-POST 两种经济运行方式的比较Comparison

  20. PRE-POST的过程控制Procedure Control Based on PRE-POST PRE-POST land and space use transition ██big scale,long construction period,2007 start██ small scale,short construction period,2009 start██ 2005 construct and put into city operation

  21. PRE-POST的过程控制Procedure Control Based on PRE-POST PRE-POST开发时序Development Time Sequence

  22. 3.世博园区数字可视化技术标准 Digital visual standard for planning & design of Expo Site

  23. 规划建设全生命周期可视化平台控制管理模式 Digital visual Lifecycle Management of Planning & building process 上层:不同软件的整合 数字平台演示 底层:不同数据的整合 数据库支撑 Upper level: integrated of different programs—visual platform display Bottom level: Integrated of different data—database support

  24. 国外相关标准 International standard • STEP • IFC 国内相关标准 National standard • 《建筑对象数字化定义》 • <Digital definition of architecture> • 《建筑设计信息模型》 (即ISO 16739) • <Digital model of architecture design>

  25. 相关技术平台 Related programs • ArchiCAD • Microstation • AutoCAD • Revit • 3DMAX • SKETCHUP • IMAGIS • 3DBrowser • DCI-VRCity • Multigen Creator • Vega • VR—platform • CityMaker

  26. 可能的技术整合模式 Possible integrated proposals A、AutoCAD(二维可视化)+SketchUp(规划级三维可视化)+3DMAX(建筑级三维可视化)+VRP(虚拟现实) B、AutoCAD(二维可视化)+SketchUp(规划级三维可视化)+Revit(建筑级三维可视化)+3DMAX+VRP(虚拟现实) C、SketchUp(规划级三维可视化)+Revit(二维可视化+建筑级三维可视化)+3DMAX+VRP(虚拟现实) D、SketchUp(规划级三维可视化)+Microstation(二维可视化+建筑级三维可视化)+ 3DMAX+VRP(虚拟现实) E、SketchUp(规划级三维可视化)+Microstation(二维可视化+建筑级三维可视化+虚拟现实)

  27. 推荐的技术标准 Suggested standard 以IFC相关标准为基准 具体操作:ArchiCAD、 Microstation、Revit均全方位支持IFC 全面引入BIM系统 IFC as basic standard Use ArchiCAD、 Microstation、Revit to support IFC Introduce BIM system

  28. 4.世博园区数字可视化管理总平台 Integrated digital visual management platform of Expo site

  29. Site supervision Land use Master plan Land use Information exchagement Logistics management Traffic Traffic Site plan Safety management Process management Architecture design smarth transportation Environment Environment safety garantee facilities Investment management facilities transportation architecture infrastructure Procedural management architecture Ticket management Etc. Etc. Etc. Etc. Etc. structure 世博园区数字可视化管理平台 Digital visual management platform 现状基础数据库系统 Existing database 规划决策支持系统 Planning & Design 建设工程管理系统 Building 运营管理系统 Operation 后续利用管理系统 Post use

  30. 软件:Program 运用DIRECTOR技术,整合整个系统平台 同时采用FLASH DREAMWEAVER PHOTOSHOP ILLUSTRATOR FIREWORKS 等软件之所长,完善系统的功能和效果。 DIRECTOR, FLASH, DREAMWEAVER to integrate following formats on one platform: dwg, jpg, swf, mpg, avi, xls…

  31. IPMA International Young Crew Workshop Shanghai,China,13th -14th October 2006 Thank you! Prof. WU Zhiqiang 2006.10.14

More Related