Boom truck arrives with the concrete forms. Horizontal rebar below window openings – south side. Ready to pour the tile stone for foundation walls. Setting the form ties. Locking the corner. Interior Big ‘O’ drain tile. Walkways on the interior forms for the workers.
E N D
Tile stone interior to cover the Big “O”, creating a base for the concrete floor