An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil Works related to Construction, laying foundation etc Vivek Kala Power Sector Western Region

  2. Subjects of our discussion • BHEL- A brief introduction • Power Sector: Meaning and Importance • Nature of civil Works in Power Sector • Areas to be taken care of in execution… • What does the Job Demand? • Its Your Turn Now!!!

  3. BHEL- The Organization YOU represent Now!! • A turnover of Rs 28,000 crore in 2008-2009 • A company with order-book of Rs 1,25,000.00 Crores • More focus being paid on project management. • International business thrust more on positioning as an EPC contractor.

  4. Power Sector: Meaning and Importance. • A arm of BHEL responsible for execution of projects • Our Role comes here!! • Direct responsibility of commissioning the projects • Projects are a mix of BTG and EPC variants • Utility projects and industry sector projects along with international operations’ projects

  5. Nature of civil Works in Power Sector • An initial survey to establish site reference coordinates and levels. • An approved Concrete design mix. • A judicious mix of T&Ps • A well thought out plan in line with project L2 schedule • An effective chase up of engineering/RFC drawings

  6. Nature of civil Works in Power Sector (Onsite Works) Main foundations/structures to be paid attention to!! • STG/GTG foundation • Turbine Building • Transformer Yard • Boiler foundation/ESP foundation • Chimney Foundation

  7. Nature of civil Works in Power Sector (Offsite Works) Main foundations/structures to be paid attention to!! • Cooling Towers • Cooling Water Pump house and Control Room • Fuel Oil Unloading/forwarding area • DM Plant • Roads and Drains

  8. Areas to be taken care of in execution… • Right coordinates and levels are stepping stone to an accurate job • Quality control with respect to Concrete mix design: check with batching plant regularly to ascertain adherence to approved mix design • Check formwork/reinforcement in accordance with RFC drawings • Accuracy and tolerances are two sides of the coin: Take care… • Embedments/insert plates and Foundation bolts are important

  9. Areas to be taken care of in execution… • Stick to your plans as far as possible and review regularly with the associate • Liaise with Engg centre and mech/elec counterparts regularly to avoid any mistakes in the structures • Equipment foundations are critical to a power plant: be doubly sure for dimensions and locations • Identify critical and non critical aspects of a structure and take decisions accordingly

  10. What does the Job Demand? • The secret of a JOB WELL DONE is to understand functional importance of any structures (in addition to the technical knowledge!!) • OWN the job and take responsibilities • A METICULOUS FOLLOW UP of engineering drawings/clarifications are a must for timely completion of any job • Treat your ASSOCIATE well, he is the KEY TO PROGRESS

  11. What does the Job Demand? • Read and understand the CONTRACT well which helps in effective dealing with the associate as well as customer • Give due attention to the timely CORRESPONDENCE both with the associate and customer

  12. Its Your Turn NOW!!!!