820 likes | 835 Views
This exhibit presents the results of the operational requirement analysis conducted in 2010 for CPUC-LTPP docket No. R.10-05-006. The study focused on regulation and load following requirements, incorporating new load, wind, and solar profiles and updated forecast errors. Detailed changes to the profiles are outlined in the appendix.
E N D