1 / 15

Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test

Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test. David Cussans, AIDA Kick-Off, February 2011. Outline. Exiting EUDET JRA1 TLU Aims for Mini-AIDA-TLU (mTLU) Specification Schedule Cost Aims for AIDA-TLU (aTLU) Use of aTLU as Beam-Interface (BIF) Summary. EUDET JRA1 TLU.

sven
Download Presentation

Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test David Cussans, AIDA Kick-Off, February 2011

  2. Outline David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Exiting EUDET JRA1 TLU • Aims for Mini-AIDA-TLU (mTLU) • Specification • Schedule • Cost • Aims for AIDA-TLU (aTLU) • Use of aTLU as Beam-Interface (BIF) • Summary

  3. EUDET JRA1 TLU David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Designed to give a simple but flexible interface to trigger/timing signals at EUDET JRA1 beam-telescope • Produces triggers from beam scintillators. • EUDET-Memo-2009-4

  4. AIDA TLU David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Existing EUDET will continue to work • AIDA TLU : compatible DUT interface • Need a new TLU • Increased trigger rate for LHC detectors • Move to an FPGA system available for lifetime of AIDA • Make it easier and cheaper to produce TLUs for integration in home labs.

  5. AIDA Mini-TLU (mTLU) David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Want to produce a prototype to test out ideas • This mini-TLU will be cheaper and easier to produce than existing TLU • Use new connector standard (FMC) , increase lifetime. • Enthusiastically adopted by CERN: 11 FMC projects already.

  6. AIDA mTLU specification David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Double-Width FMC with single LPC connector. • Use e.g. Xilinx SP601 to host. 75mm 139mm

  7. AIDA mTLU Front Panel David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Four PMT inputs (Lemo-00) • One clock I/O (2-pole Lemo-00) • One GPIO (Lemo-00) • Two DUT (HDMI)

  8. AIDA mTLU Interface David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Four PMT Inputs (Lemo-00) • Threshold controllable by DAC • Two DUT interfaces (HDMI) • Wanted to use RJ45 (compatibility), but won't fit on FMC • “Dongles” for conversion to LVDS/RJ45 or TTL/LEMO • Powered via HDMI cable

  9. AIDA mTLU Interface David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Communication to DAQ by Gigabit Ethernet • Use “IPBus” firmware developed for CMS. • Hosted on Hepforge (CACTUS) • http://projects.hepforge.org/cactus/trac/browser/trunk/doc/related/Simple_IP_uTCA_Protocol_r1_2.pdf

  10. Design/Firmware/Software David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Store design ( PCB, firmware) in “Open Hardware” site • http://www.ohwr.org/projects/fmc-mtlu • Hosted by CERN • Many ( ~ 11) FMC designs already • GPL / TAPR-OHL licence • Reuse large parts of EUDAQ firmware • Work with Geneva to produce mTLU producer.

  11. Beam Interface Prototype David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Requirement for CALICE beam-interface (BIF) for beam-test. • Can use mTLU as prototype BIF • HDMI connector physically compatible with DIF-LDA link. • Full aTLU as a BIF • Hardware should work – but BIF-specific firmware needed.

  12. Summary David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Work under-way to produce a AIDA mini-TLU • Aiming for early release • Low(er) cost way of integrating to EUDAQ at home lab. • Fully specify aTLU in light of mTLU experience • Can use same hardware (and probably most of the firmware) as a Beam-Interface (BIF)

  13. Backup Slides David Cussans, AIDA Kick-Off, 16-19 Feb 2011

  14. JRA1 TLU Interface David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Different triggering modes: • No handshake (trigger pulses high) • Trigger-Busy handshake • Trigger Data handshake

  15. JRA1 TLU Interface David Cussans, AIDA Kick-Off, 16-19 Feb 2011 • Triggers can be vetoed by DUT raising TRIGGER_CLOCK line. • Can be combined with simple trigger/busy handshake for “dead-time free” readouts that send a continuous stream of data. • Send “buffer almost full” signal. • Time-stamp stored for each trigger.

More Related